Capital Project Tracker

Rendering of Lakeside Center

In order to invest in the care of our parks, we must regularly redesign and rebuild our city’s parks and facilities. There are more than 500 active projects taking place at any time in parks throughout the city, ranging from improvements to parks, playgrounds, and greenways, to renovations of ball fields and recreational facilities, to resiliency efforts for beaches and boardwalks. Learn more about projects taking place near you, and find out the current status of a project.

How We Build Parks

Visit our How We Build Parks page to learn more about the three main phases of the city’s capital process and how a project becomes eligible for capital funding.

View Active ProjectsView Proposed ProjectsView Partner ProjectsView Completed Projects

Completed Projects View only projects nearing completion

Bronx Projects

Park Project Phase Completion Date
Abigail Playground Bronx and Queens Roofing Systems Reconstruction (CNYG-1114M) Completed April 2019
Agnes Haywood Playground Agnes Haywood Playground Reconstruction Completed March 2019
Allerton Playground Bronx General Site Work (XG-114M) Completed March 2017
Allerton Playground Bronx General Site Work (XG-514M) Completed February 2017
Aqueduct Walk Aqueduct Walk 182nd Place Pathway Reconstruction Completed June 2014
Aqueduct Walk Aqueduct Walk 182nd Street Comfort Station Construction Completed August 2019
Aqueduct Walk Aqueduct Walk Plaza Reconstruction Completed October 2019
Aqueduct Walk Old Croton Aqueduct Signage Installation Completed April 2017
Arcilla Playground Bronx and Queens Roofing Systems Reconstruction (CNYG-3009M) Completed June 2015
Bicentennial Veterans Memorial Park Bronx General Site Work (XG-315M) Completed December 2017
Black Rock Playground Black Rock Playground Reconstruction Completed April 2019
Bronx Park Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1) Completed June 2015
Bronx Park Bronx and Queens Roofing Systems Reconstruction (CNYG-3009M) Completed June 2015
Bronx Park Bronx and Queens Roofing Systems Reconstruction (CNYG-315MA) Completed October 2018
Bronx Park Bronx Park Adult Fitness Equipment Construction Completed July 2019
Bronx Park Bronx Park Anadromous Fish Passage Reconstruction Completed December 2014
Bronx Park Bronx Park Brady Playground Adult Fitness Equipment Construction Completed January 2017
Bronx Park Bronx Park Dog Run Construction Completed June 2019
Bronx Park Bronx River Park Greenway Construction Completed June 2017
Bronx River Parkway Bronx and Queens Roofing Systems Reconstruction (CNYG-3009M) Completed June 2015
Bronx River Parkway Bronx River Park 233rd Street Bikeway Reconstruction Completed May 2019
Bronx River Parkway Parque de los Ninos Playground and Seating Area Reconstruction Completed March 2017
Bronx River Parkway Parque de los Ninos Softball Field and Running Track Construction Completed July 2019
Bronx River Parkway Shoelace Park Green Infrastructure Construction Completed July 2018
Bufano Park Bronx General Site Work (XG-315M) Completed December 2017
Caserta Playground Bronx and Queens Roofing Systems Reconstruction (CNYG-3009M) Completed June 2015
Castle Hill Park Castle Hill Park Paths Construction Completed January 2016
Cedar Playground Cedar Playground Basketball Court and Playground Reconstruction Completed August 2016
Claremont Park Bronx General Site Work (XG-114M) Completed March 2017
Co-op City Field Co-Op City Field Bleacher and Pathway Reconstruction Completed August 2014
Colucci Playground Bronx and Queens Roofing Systems Reconstruction (CNYG-3009M) Completed June 2015
Colucci Playground Colucci Park Seating Area Reconstruction Completed August 2017
Cooney Grauer Field Cooney Grauer Field Chain Link Fence Construction Completed September 2014
Crotona Park Citywide Pool Structural Systems Reconstruction (CNYG-1011M) Completed June 2017
Crotona Park Citywide Electrical Systems Reconstruction (CNYG-1611MA) Completed July 2017
Crotona Park Bronx and Queens Roofing Systems Reconstruction (CNYG-3009M) Completed June 2015
Crotona Park Bronx and Queens Roofing Systems Reconstruction (CNYG-315MA) Completed October 2018
Crotona Park Bronx General Site Work (XG-410M) Completed September 2013
Crotona Park Crotona Park Tennis Building Electrical Upgrade Completed December 2014
Crotona Park Crotona Pool Wall and Fence Reconstruction Completed August 2019
Devoe Park Devoe Park Perimeter Steel Gates Installation Completed December 2018
Dunbar Playground Bronx General Site Work (XG-114M) Completed March 2017
Eastchester Playground Bronx General Site Work (XG-514M) Completed February 2017
Eastchester Playground Bronx and Queens Roofing Systems Reconstruction (CNYG-3009M) Completed June 2015
Edenwald Playground Citywide Pool Plumbing Systems Reconstruction (CNYG-915M) Completed June 2019
Edenwald Playground Citywide Pool Structural Systems Reconstruction (CNYG-1015M) Completed June 2019
Estella Diggs Park Estella Diggs Park Reconstruction Completed May 2017
Ewen Park Ewen Park Tot Lot Construction and Basketball Court Reconstruction Completed December 2016
Ferry Point Park Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1) Completed June 2015
Ferry Point Park Ferry Point Community Park Comfort Station Construction Completed July 2015
Ferry Point Park Ferry Point Park Golf Course Construction Completed June 2014
Ferry Point Park Ferry Point Park Golf Course Parking Lot Reconstruction Completed May 2015
Ferry Point Park Ferry Point Park Reconstruction (Hurricane Sandy) Completed January 2017
Ferry Point Park Ferry Point Park West Comfort Station Construction Completed March 2018
Ferry Point Park Ferry Point Park West Comfort Station Construction - Electrical Completed March 2018
Ferry Point Park Ferry Point Park West Comfort Station Construction - HVAC Completed March 2018
Ferry Point Park Ferry Point Park West Comfort Station Construction - Plumbing Completed March 2018
Gouverneur Playground Bronx and Queens Roofing Systems Reconstruction (CNYG-3009M) Completed June 2015
Grand Playground Grand Playground Construction Completed June 2017
Grove Hill Playground Bronx and Queens Roofing Systems Reconstruction (CNYG-3009M) Completed June 2015
Haffen Park Citywide Buildings Reconstruction (CNYG-209M) Completed February 2015
Haffen Park Bronx General Site Work (XG-410M) Completed September 2013
Harris Park Citywide Electrical Systems Reconstruction (CNYG-1611MA) Completed July 2017
Harris Park Citywide Buildings Reconstruction (CNYG-209M) Completed February 2015
Harris Park Harris Park Reconstruction Completed February 2018
Henry Hudson Park Bronx and Queens Roofing Systems Reconstruction (CNYG-3009M) Completed June 2015
Henry Hudson Park Henry Hudson Park Basketball and Handball Courts Reconstruction Completed September 2019
Highbridge Park Old Croton Aqueduct Signage Installation Completed April 2017
Hilton White Playground Bronx and Queens Roofing Systems Reconstruction (CNYG-3009M) Completed June 2015
Hunts Point Playground Hunts Point, Playground 52, Carmansville, MLK, and Sol Lain Playgrounds Comfort Station Reconstruction Completed October 2018
Hunts Point Playground Hunts Point Playground Reconstruction Completed May 2019
Hutchinson River Parkway Hutchinson River Greenway Construction Completed October 2013
I-Am-Park Bronx General Site Work (XG-114M) Completed March 2017
Jerome Park Old Croton Aqueduct Signage Installation Completed April 2017
Jerome Park Jerome Park Reservoir Jogging Trail Construction Completed December 2014
Joyce Kilmer Park Joyce Kilmer Park Perimeter Fence Construction Completed March 2018
Little Claremont Playground Little Claremont Playground Reconstruction Completed December 2018
Longfellow Playground Longfellow Gardens Reconstruction Completed September 2018
Loreto Playground Bronx and Queens Roofing Systems Reconstruction (CNYG-3009M) Completed June 2015
Lozada Playground Bronx General Site Work (XG-514M) Completed February 2017
Lyons Square Playground Lyons Square Playground Reconstruction Completed December 2017
Macombs Dam Park Bronx General Site Work (XG-415M) Completed December 2018
Mapes Pool Citywide Pool Electrical Systems Reconstruction (CNYG-815MA) Completed June 2019
Mapes Pool Citywide Pool Plumbing Systems Reconstruction (CNYG-915M) Completed June 2019
Mapes Pool Citywide Pool Structural Systems Reconstruction (CNYG-1015M) Completed June 2019
Mazzei Playground Bronx General Site Work (XG-514M) Completed February 2017
Merriam Playground Bronx General Site Work (XG-410M) Completed September 2013
Millbrook Playground Millbrook Playground Basketball and Handball Court Reconstruction Completed June 2018
Morgan Playground Bronx General Site Work (XG-410M) Completed September 2013
Mosholu Parkway Bronx General Site Work (XG-114M) Completed March 2017
Mosholu Parkway Mosholu Parkway WWI Monument Lighting System Construction Completed September 2013
Mott Playground Bronx and Queens Roofing Systems Reconstruction (CNYG-3009M) Completed June 2015
Mount Hope Garden Mt. Hope Garden Play Area Reconstruction Completed December 2018
Mullaly Park Citywide Electrical Systems Reconstruction (CNYG-1611MA) Completed July 2017
Mullaly Park Citywide Pool Electrical Systems Reconstruction (CNYG-815MA) Completed June 2019
Mullaly Park Citywide Pool Plumbing Systems Reconstruction (CNYG-915M) Completed June 2019
Mullaly Park Citywide Pool Structural Systems Reconstruction (CNYG-1015M) Completed June 2019
Mullaly Park Mullaly Recreation Center Door Replacement Completed March 2018
Nelson Playground Bronx and Queens Roofing Systems Reconstruction (CNYG-1114M) Completed April 2019
Nelson Playground Nelson Playground Basketball Court and Bleachers Reconstruction Completed December 2018
Ogden Plimpton Playground Ogden Plimpton Playground Reconstruction Completed December 2018
Pelham Bay Park Bronx General Site Work (XG-315M) Completed December 2017
Pelham Bay Park Bronx, Manhattan and Queens Reforestation FY15 Completed October 2017
Pelham Bay Park Bronx General Site Work (XG-415M) Completed December 2018
Pelham Bay Park Orchard Beach Nature Center Roof Reconstruction Completed July 2018
Pelham Bay Park Orchard Beach Pavilion Fencing, Netting, and Scaffolding Emergency Installation Completed September 2013
Pelham Bay Park Pelham Bay Park Adult Fitness Equipment and Nature Walk Construction Completed August 2017
Pelham Bay Park Pelham Bay Park Ballfields 4 & 5 Lighting Reconstruction Completed May 2017
Pelham Bay Park Pelham Bay Park Guiderail Installation Completed December 2016
Pelham Bay Park Pelham Bay Park Service Building Gas Line Construction and Heating System Reconstruction Completed March 2019
Pelham Bay Park Pelham Bay Park Waterfront Reconstruction Completed September 2015
Pelham Parkway Pelham Parkway Malls Reconstruction Completed November 2017
People's Park Citywide Comfort Station and Facility Plumbing & HVAC Reconstruction (CNYG-1014M) Completed March 2019
People's Park Citywide Comfort Station and Facility Reconstruction (CNYG-814MA) Completed May 2019
People's Park Citywide Electrical Systems Reconstruction (CNYG-914M) Completed March 2019
Playground 52 LII Hunts Point, Playground 52, Carmansville, MLK, and Sol Lain Playgrounds Comfort Station Reconstruction Completed October 2018
Playground 52 LII Kelly Playground Skate Park Reconstruction Completed July 2018
Playground 52 LII Playground 52 Reconstruction Completed March 2018
Pugsley Creek Park Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1) Completed June 2015
Pugsley Creek Park Pugsley Creek Park Basketball Court Construction Completed June 2016
Ranaqua Playground Ranaqua Park Reconstruction Completed December 2017
Randall Playground Bronx and Queens Roofing Systems Reconstruction (CNYG-3009M) Completed June 2015
Rev J Polite Playground Bronx and Queens Roofing Systems Reconstruction (CNYG-1114M) Completed April 2019
Riverbend Playground Bronx General Site Work (XG-415M) Completed December 2018
Seabury Playground Seabury Playground Reconstruction Completed September 2017
Soundview Park Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1) Completed June 2015
Soundview Park Bronx, Manhattan and Queens Reforestation FY15 Completed October 2017
Soundview Park Bronx River Greenway Construction Completed August 2014
Soundview Park Soundview Park Comfort Station Construction Completed December 2016
Soundview Park Soundview Park Dog Run Construction Completed June 2016
Soundview Park Soundview Park Performance Lawn and Overlook Construction Completed April 2015
Soundview Park Soundview Park Playground and Sports Courts Reconstruction Completed May 2017
Soundview Park Soundview Park Running Track and Athletic Field Construction Completed June 2014
St. James Park Citywide Electrical Systems Reconstruction (CNYG-1611MA) Completed July 2017
St. James Park Bronx General Site Work (XG-114M) Completed March 2017
St. James Park Bronx and Queens Roofing Systems Reconstruction (CNYG-3009M) Completed June 2015
St. James Park Bronx General Site Work (XG-415M) Completed December 2018
St. Mary's Park Citywide Pool Structural Systems Reconstruction (CNYG-1011M) Completed June 2017
St. Mary's Park Bronx and Queens Roofing Systems Reconstruction (CNYG-3009M) Completed June 2015
St. Mary's Park St. Mary's Park and Recreation Center Green Infrastructure Construction Completed October 2019
St. Mary's Park St. Mary's Park Playground West Reconstruction Completed August 2019
St. Mary's Park St. Mary's Recreation Center Pool and Gymnasium HVAC Reconstruction Completed December 2018
Stebbins Playground Bronx General Site Work (XG-114M) Completed March 2017
Tiffany Street Pier Tiffany Street Pier Reconstruction (Hurricane Sandy) Completed April 2018
Tremont Park Citywide Comfort Station and Facility Plumbing & HVAC Reconstruction (CNYG-1014M) Completed March 2019
Tremont Park Citywide Comfort Station and Facility Reconstruction (CNYG-814MA) Completed May 2019
Tremont Park Citywide Electrical Systems Reconstruction (CNYG-914M) Completed March 2019
University Malls Old Croton Aqueduct Signage Installation Completed April 2017
University Woods University Park Stairway Reconstruction Completed June 2014
Van Cortlandt Park Old Croton Aqueduct Signage Installation Completed April 2017
Van Cortlandt Park Bronx and Queens Roofing Systems Reconstruction (CNYG-3009M) Completed June 2015
Van Cortlandt Park Citywide Pool Plumbing Systems Reconstruction (CNYG-714M) Completed April 2018
Van Cortlandt Park Van Cortlandt Park Dog Run Construction Completed June 2018
Van Nest Park Van Nest Flag Pole and Plaza Construction Completed February 2019
Van Nest Park Van Nest Playground Reconstruction Completed January 2015
Vidalia Park Bronx General Site Work (XG-315M) Completed December 2017
Vinmont Veteran Park Bronx and Queens Roofing Systems Reconstruction (CNYG-3009M) Completed June 2015
Vinmont Veteran Park Bronx General Site Work (XG-315M) Completed December 2017
Walton Park Walton Park Reconstruction Completed February 2019
Washington's Walk Bronx General Site Work (XG-410M) Completed September 2013
Whalen Playground Whalen Park Reconstruction Completed June 2018
Williamsbridge Oval Citywide Electrical Systems Reconstruction (CNYG-309M) Completed January 2014
Williamsbridge Oval Bronx and Manhattan Recreation and Nature Center HVAC Repair (CNYG-1810MA) Completed July 2015
Williamsbridge Oval Williamsbridge Oval Recreation Building Reconstruction Completed November 2013
Williamsbridge Oval Williamsbridge Oval Skate Park Construction Completed July 2019
Willis Playground Bronx General Site Work (XG-514M) Completed February 2017
Willis Playground Willis Playground Comfort Station Roof Reconstruction Completed October 2016
Yolanda García Park Yolanda Garcia Park Construction Completed April 2019
Zimmerman Playground Zimmerman Playground Comfort Station Roof Reconstruction Completed April 2017
Bronx General Site Work (XG-514M) Completed February 2017
Bronx River Greenway Construction Completed August 2014
Amendola Plaza Reconstruction Completed April 2017
Belden Point Reconstruction Completed December 2015
Bronx Invasive Species Removal and Tree Planting FY14 Completed November 2016
Bronx Sandy-Related Tree Removal Completed July 2015
Bronx Sandy-Related Tree Replacement Completed March 2016
Bronx Street Tree Planting FY13 - Community Boards 1-8 (XG-113M) Completed February 2014
Bronx Street Tree Planting FY13 - Community Boards 9-12 (XG-213M) Completed February 2014
Bronx Street Tree Planting FY13 - Community Boards 9-12 (XG-412M) Completed August 2013
Bronx Street Tree Planting FY14 - Community Boards 1-6 Completed January 2015
Bronx Street Tree Planting FY14 - Community Boards 7-12 Completed January 2015
Bronx Street Tree Planting FY15 - Community Boards 1-8 Completed February 2016
Bronx Street Tree Planting FY15 - Community Boards 9-12 Completed April 2016
Bronx Street Tree Planting FY16 - Community Boards 1-8 Completed August 2017
Bronx Street Tree Planting FY16 - Community Boards 9-12 Completed August 2017
Bronx Street Tree Planting FY17 - Community Boards 1-8 Completed June 2018
Bronx Street Tree Planting FY17 - Community Boards 9-12 Completed June 2018
Crotona Parkway Green Infrastructure Construction Completed June 2015
Jackson Forest Community Garden Reconstruction Completed April 2017

Brooklyn Projects

Park Project Phase Completion Date
American Veterans Memorial Pier Bay Ridge Eco-Dock Construction Completed September 2013
Asser Levy Park Asser Levy Park Flagpole Installation Completed September 2015
Asser Levy Park Asser Levy Park Playground & Path Reconstruction Completed December 2018
Banneker Playground Banneker Playground Comfort Station Roof Reconstruction Completed May 2018
Bayview Playground Citywide Comfort Station and Facility Plumbing & HVAC Reconstruction (CNYG-1014M) Completed March 2019
Bayview Playground Citywide Comfort Station and Facility Reconstruction (CNYG-814MA) Completed May 2019
Bayview Playground Citywide Electrical Systems Reconstruction (CNYG-914M) Completed March 2019
Bayview Playground Linden Park Handball Court and Bayview Playground Baseball Field Reconstruction Completed June 2014
Beaver Noll Park Beaver Noll Park Construction Completed June 2019
Belt Parkway/Shore Parkway Belt Parkway Landscape Restoration and Tree Planting at Canarsie Completed June 2019
Belt Parkway/Shore Parkway Shore Parkway Emergency Protective Measures (Hurricane Sandy) Completed November 2013
Benson Playground Benson Playground Asphalt Field and Handball Court Reconstruction Completed May 2017
Bensonhurst Park Brooklyn General Site Work (BG-711M) Completed June 2014
Bergen Beach Playground Bergen Beach Playground Reconstruction Completed October 2018
Berriman Playground Gateway Estates Phase 1 Playground and Comfort Station Construction Completed February 2019
Berriman Playground Gateway Estates Phase 1 Playground and Comfort Station Construction - Electrical Completed February 2019
Berriman Playground Gateway Estates Phase 1 Playground and Comfort Station Construction - HVAC Completed February 2019
Berriman Playground Gateway Estates Phase 1 Playground and Comfort Station Construction - Plumbing Completed February 2019
Betsy Head Park Betsy Head Playground Reconstruction Completed December 2015
Betsy Head Park Brooklyn and Staten Island Roofing Systems Reconstruction (CNYG-415M) Completed July 2017
Betsy Head Park Citywide Pool Electrical Systems Reconstruction (CNYG-614M) Completed October 2018
Betsy Head Park Citywide Pool Plumbing Systems Reconstruction (CNYG-714M) Completed April 2018
Bill Brown Playground Bill Brown Playground Comfort Station Reconstruction Completed June 2019
Brighton Playground Brooklyn General Site Work For Hurricane Sandy (BG-1113M) Completed December 2016
Brizzi Playground Dyker Beach Park Paths and Brizzi Playground Reconstruction Completed November 2014
Brower Park Brower Park Skate Park Element Installation Completed July 2016
Brownsville Playground Brooklyn and Queens Recreation and Nature Centers HVAC Systems Reconstruction (CNYG-1910MA1) Completed October 2018
Brownsville Playground Brooklyn and Staten Island Roofing Systems Reconstruction (CNYG-3109M) Completed June 2014
Brownsville Playground Brownsville Recreation Center Pool HVAC System Reconstruction Completed March 2014
Brownsville Playground Brownsville Recreation Center Pool Roof Reconstruction Completed June 2017
Bushwick Playground Citywide Electrical Systems Reconstruction (CNYG-907M) Completed October 2014
Bushwick Playground Citywide Plumbing Systems Reconstruction (CNYG-1007M) Completed April 2014
Bushwick Playground Citywide Pool Plumbing Systems Reconstruction (CNYG-714M) Completed April 2018
Bushwick Playground Bushwick Playground Pool Reconstruction Completed June 2017
Bushwick Playground Citywide Buildings Reconstruction (CNYG-209M) Completed February 2015
Bushwick Playground Citywide Pool Electrical Systems Reconstruction (CNYG-815MA) Completed June 2019
Bushwick Playground Citywide Pool Plumbing Systems Reconstruction (CNYG-915M) Completed June 2019
Bushwick Playground Citywide Pool Structural Systems Reconstruction (CNYG-1015M) Completed June 2019
Butterfly Gardens Butterfly Gardens Pavement Reconstruction and Planted Area Expansion Completed September 2018
Calvert Vaux Park Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1) Completed June 2015
Calvert Vaux Park Calvert Vaux Park Aquatic and Coastal Upland Habitat Restoration Completed August 2013
Calvert Vaux Park Calvert Vaux Park Soccer Fields Construction Completed October 2013
Canarsie Park Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1) Completed June 2015
Canarsie Park Brooklyn and Staten Island Roofing Systems Reconstruction (CNYG-415M) Completed July 2017
Canarsie Park Canarsie Park Playground Construction Completed October 2013
Canarsie Park Canarsie West Trail Connector Construction Completed May 2018
Carroll Park Brooklyn General Site Work For Hurricane Sandy (BG-1113M) Completed December 2016
Carver Playground Citywide Plumbing Systems Reconstruction (CNYG-1007M) Completed April 2014
City Line Park City Line Park Synthetic Turf Field, Skate Park, and Basketball Court Construction Completed July 2019
Coffey Park Brooklyn General Site Work For Hurricane Sandy (BG-1113M) Completed December 2016
Coffey Park Coffey Park Pathway and Barbecue Area Reconstruction Completed June 2015
Colonel David Marcus Playground Jackie Robinson Playground and Colonel David Marcus Southeast Playground Reconstruction Completed August 2016
Colonel David Marcus Playground Ocean Parkway Malls and Colonel David Marcus Playground Reconstruction Completed October 2014
Columbus Park Columbus Park Pavement Reconstruction Completed November 2016
Commodore Barry Park Commodore Barry Park Pool Reconstruction Completed June 2017
Coney Island Beach & Boardwalk Brooklyn and Staten Island Roofing Systems Reconstruction (CNYG-3109M) Completed June 2014
Coney Island Beach & Boardwalk Coney Island Beach Entrance Garden Construction at Brighton 2nd and West 33rd Sts Completed April 2015
Coney Island Beach & Boardwalk Coney Island Boardwalk Reconstruction, Brighton 15th Street to Coney Island Avenue Completed May 2016
Cooper Park Cooper Park Dog Run Construction and Athletic Courts Reconstruction Completed December 2015
Crispus Attucks Playground Crispus Attucks Playground Handball and Basketball Court Reconstruction Completed April 2017
Cypress Hills Playground Cypress Hills Playground Synthetic Turf Field Construction Completed October 2019
De Hostos Playground Brooklyn and Staten Island General Roofing Systems Reconstruction (CNYG-1214MA) Completed February 2019
Dean Playground Brooklyn General Site Work (BG-711M) Completed June 2014
DiGilio Playground Di Gilio Playground Reconstruction Completed May 2018
Dimattina Playground DiMattina Park, Dyker Beach Park, and Owl's Head Park Dog Run Reconstruction Completed March 2015
Dome Playground Dome Playground Basketball and Handball Courts Reconstruction Completed March 2018
Dome Playground Dome Playground Play Area and Lawn Reconstruction Completed April 2016
Dyker Beach Park Dyker Beach Park Paths and Brizzi Playground Reconstruction Completed November 2014
Dyker Beach Park DiMattina Park, Dyker Beach Park, and Owl's Head Park Dog Run Reconstruction Completed March 2015
Dyker Beach Park Dyker Beach Park Synthetic Turf Soccer Field Reconstruction Completed June 2018
El Shabazz Playground Citywide Comfort Station and Facility Plumbing & HVAC Reconstruction (CNYG-1014M) Completed March 2019
El Shabazz Playground Citywide Comfort Station and Facility Reconstruction (CNYG-814MA) Completed May 2019
El Shabazz Playground Citywide Electrical Systems Reconstruction (CNYG-914M) Completed March 2019
Eleanor Roosevelt Playground Brooklyn and Staten Island Roofing Systems Reconstruction (CNYG-3109M) Completed June 2014
Ennis Playground Ennis Playground Reconstruction Completed July 2019
Fidler-Wyckoff House Park Wyckoff House Roof Reconstruction Completed June 2018
Fort Greene Park Fort Greene Park Willoughby Avenue Entrance Reconstruction Completed December 2015
Fulton Park Fulton Park Comfort Station Reconstruction Completed May 2019
Glenwood Playground Citywide Pool Plumbing Systems Reconstruction (CNYG-915M) Completed June 2019
Glenwood Playground Citywide Pool Structural Systems Reconstruction (CNYG-1015M) Completed June 2019
Glenwood Playground Glenwood Playground Synthetic Turf Field Construction Completed April 2017
Glenwood Playground Wingate Park & Glenwood Playground Reconstruction Completed May 2016
Gravesend Park Gravesend Park Comfort Station Construction Completed June 2017
Gravesend Park Gravesend Park Playground and Court Area Reconstruction Completed October 2016
Green Central Knoll Green Central Knoll Comfort Station Construction Completed August 2019
Hamilton Metz Field Brooklyn General Site Work (BG-711M) Completed June 2014
Harry Maze Playground Harry Maze Playground Security Lighting Installation Completed May 2017
Harry Maze Playground Hickman Playground and Harry Maze Playground Multipurpose Field Reconstruction Completed August 2016
Heckscher Playground Brooklyn and Staten Island Roofing Systems Reconstruction (CNYG-415M) Completed July 2017
Heckscher Playground Heckscher Playground Reconstruction Completed June 2016
Heckscher Playground Wingate Park Gym, Heckscher Playground, and Nautilus Playground Reconstruction Completed May 2017
Hendrick I. Lott House Lott House Landscape Reconstruction Completed May 2015
Hickman Playground Hickman Playground and Harry Maze Playground Multipurpose Field Reconstruction Completed August 2016
Hilltop Playground Hilltop Playground Reconstruction Completed July 2017
Hope Ballfield Hope Ballfield Reconstruction Completed May 2019
J.J. Byrne Playground JJ Byrne Park Synthetic Turf Lawn Construction Completed March 2019
Jackie Robinson Playground Brooklyn and Staten Island Roofing Systems Reconstruction (CNYG-415M) Completed July 2017
Jackie Robinson Playground Jackie Robinson Playground and Colonel David Marcus Southeast Playground Reconstruction Completed August 2016
Jacob Joffe Fields Jacob Joffe Fields Adult Fitness Area Construction and Sport Courts Reconstruction Completed April 2019
Jaime Campiz Playground Jaime Campiz Playground Basketball Courts and Adult Fitness Area Reconstruction Completed August 2018
Jesse Owens Playground Jesse Owens, Stockton and Stroud Playgrounds Comfort Station Reconstruction Completed June 2019
John Allen Payne Playground John Allen Payne Playground Reconstruction Completed July 2018
Kolbert Playground Kolbert Playground Reconstruction Completed April 2018
Kosciuszko Pool Citywide Pool Structural Systems Reconstruction (CNYG-1011M) Completed June 2017
Kosciuszko Pool Citywide Electrical Systems Reconstruction (CNYG-1611MA) Completed July 2017
Kosciuszko Pool Citywide Plumbing Systems Reconstruction (CNYG-1711MA1) Completed June 2016
Lafayette Playground Lafayette Playground Reconstruction Completed July 2019
Leif Ericson Park Leif Ericson Park Comfort Station Construction Completed December 2015
Lincoln Terrace / Arthur S. Somers Park Lincoln Terrace Park Netball Court and Seth Low Playground Athletic Court Reconstruction Completed August 2016
Lincoln Terrace / Arthur S. Somers Park Lincoln Terrace Park Playground Reconstruction Completed January 2019
Lincoln Terrace / Arthur S. Somers Park Lincoln Terrace Park Tennis Courts Reconstruction Completed November 2013
Linden Park Linden Park Handball Court and Bayview Playground Baseball Field Reconstruction Completed June 2014
Linden Park Brooklyn and Staten Island General Roofing Systems Reconstruction (CNYG-1214MA) Completed February 2019
Linden Park Linden Park Adult Fitness Area Construction Completed October 2016
Linden Park Linden Park Synthetic Turf Field and Rubberized Track Reconstruction Completed October 2019
Lindower Park Lindower Park Ballfield Reconstruction Completed December 2015
Lott Park Brooklyn General Site Work (BG-1007M) Completed October 2013
Lt. Joseph Petrosino Park Lt. Joseph Petrosino Park Reconstruction Completed January 2019
Luna Playground Brooklyn and Staten Island Roofing Systems Reconstruction (CNYG-3109M) Completed June 2014
Manhattan Beach Park Brooklyn General Site Work (BG-711M) Completed June 2014
Manhattan Beach Park Manhattan Beach Sport Courts Reconstruction Completed April 2018
Marine Park Dr. John's Playground Paths, Water Supply & Drainage System Reconstruction Completed April 2018
Marine Park Marine Park Bike Path Restoration Completed December 2014
Marine Park Marine Park Bocce Court and Sport Court Reconstruction Completed December 2016
Marine Park Marine Park Gerritsen Avenue Pedestrian Path Construction Phase 1 Completed April 2017
Marine Park Marine Park Gerritsen Avenue Pedestrian Path Construction Phase 2 Completed October 2019
Marine Park Marine Park Seba Playground Expansion Completed May 2014
Marine Park Marine Park Veterans Memorial Reconstruction Completed October 2018
Marlboro Playground Brooklyn General Site Work (BG-1007M) Completed October 2013
Marlboro Playground Marlboro Playground Security Lighting Installation Completed March 2017
Martin Luther King Jr. Playground Martin Luther King Jr. Playground Spray Shower, Ocean Hill Playground, and Wingate Park Playground Reconstruction Completed August 2017
Martinez Playground Brooklyn General Site Work (BG-1007M) Completed October 2013
McCarren Park Brooklyn General Site Work (BG-711M) Completed June 2014
McCarren Park Citywide Pool Plumbing Systems Reconstruction (CNYG-714M) Completed April 2018
McCarren Park Citywide Sandy-Related Recreational Lighting and Electrical Line Reconstruction Completed November 2013
McCarren Park McCarren Park Pool & Bath House Reconstruction Completed June 2014
McCarren Park McCarren Park Synthetic Turf Soccer Field Reconstruction Completed January 2019
McGuire Fields Brooklyn General Site Work For Hurricane Sandy (BG-1113M) Completed December 2016
McKinley Park McKinley Park and Seth Low Playground Synthetic Turf Ballfield Reconstruction Completed September 2017
Metropolitan Recreation Center Citywide Pool Structural Systems Reconstruction (CNYG-1011M) Completed June 2017
Msgr. McGolrick Park McGolrick Park Playground Reconstruction Completed September 2018
Nautilus Playground Brooklyn General Site Work For Hurricane Sandy (BG-1113M) Completed December 2016
Nautilus Playground Wingate Park Gym, Heckscher Playground, and Nautilus Playground Reconstruction Completed May 2017
Nautilus Playground Nautilus Playground Reconstruction Completed June 2016
Newport Playground Newport Playground Reconstruction Completed July 2019
North 5th Street Pier and Park North 5th Street Pier and Park Bulkhead Reconstruction (Hurricane Sandy) Completed September 2018
Nostrand Playground Nostrand Playground Sport Courts Reconstruction Completed August 2019
Ocean Hill Playground Martin Luther King Jr. Playground Spray Shower, Ocean Hill Playground, and Wingate Park Playground Reconstruction Completed August 2017
Ocean Parkway Malls Brooklyn General Site Work For Hurricane Sandy (BG-1113M) Completed December 2016
Ocean Parkway Malls Ocean Parkway Malls and Colonel David Marcus Playground Reconstruction Completed October 2014
Ocean Parkway Malls Ocean Parkway Malls Reconstruction, Shore Pkwy to Sea Breeze Ave Completed May 2014
Owl's Head Park DiMattina Park, Dyker Beach Park, and Owl's Head Park Dog Run Reconstruction Completed March 2015
Owl's Head Park Owl's Head Park Flagpole Installation Completed March 2016
Paerdegat Basin Park Paerdegat Basin Yacht Club Parking Lot Reconstruction Completed June 2018
Paerdegat Park Paerdegat Park Basketball Court Reconstruction Completed March 2015
Patrick O'Rourke Playground Patrick O'Rourke Playground Reconstruction Completed September 2016
Pfc Norton Playground PFC Thomas Norton Comfort Station Reconstruction Completed November 2014
Pink Playground Brooklyn and Staten Island Roofing Systems Reconstruction (CNYG-3109M) Completed June 2014
Poseidon Playground Brooklyn and Staten Island General Roofing Systems Reconstruction (CNYG-1214MA) Completed February 2019
Poseidon Playground Brooklyn Boiler & Heating Systems Reconstruction (BG-611M) Completed June 2014
Powell Playground Powell Park Adult Fitness Area Construction and Athletic Court Reconstruction Completed October 2016
Prospect Park Citywide Electrical Systems Reconstruction (CNYG-1611MA) Completed July 2017
Prospect Park Brooklyn and Staten Island Roofing Systems Reconstruction (CNYG-3109M) Completed June 2014
Prospect Park Brooklyn Boiler & Heating Systems Reconstruction (BG-611M) Completed June 2014
Prospect Park Litchfield Villa Telecommunications Installation Completed June 2015
Prospect Park Prospect Park Litchfield Villa Boiler and HVAC Systems Reconstruction Completed December 2015
Pulaski Playground Pulaski and Tilden Playground Tennis Court and Play Area Reconstruction Completed October 2013
Red Hook Recreation Area Citywide Pool Structural Systems Reconstruction (CNYG-1011M) Completed June 2017
Red Hook Recreation Area Citywide Electrical Systems Reconstruction (CNYG-1611MA) Completed July 2017
Red Hook Recreation Area Citywide Plumbing Systems Reconstruction (CNYG-1711MA1) Completed June 2016
Red Hook Recreation Area Red Hook Pool Reconstruction Completed June 2018
Red Hook Recreation Area Red Hook Recreation Center Sandy-Related Emergency Boiler Reconstruction Completed June 2014
Samuel Goldberg Triangle Samuel Goldberg Triangle Reconstruction Completed February 2019
Saratoga Park Saratoga Square Park Memorial Reconstruction Completed August 2014
Seeley Park Seeley Park Reconstruction Completed December 2014
Seth Low Playground/ Bealin Square Lincoln Terrace Park Netball Court and Seth Low Playground Athletic Court Reconstruction Completed August 2016
Seth Low Playground/ Bealin Square McKinley Park and Seth Low Playground Synthetic Turf Ballfield Reconstruction Completed September 2017
Shore Park and Parkway Shore Road Park Steel Fence Installation, Vegetation Removal and Erosion Control Completed June 2019
Sixteen Sycamores Playground Citywide Electrical Systems Reconstruction (CNYG-907M) Completed October 2014
Sixteen Sycamores Playground Citywide Plumbing Systems Reconstruction (CNYG-1007M) Completed April 2014
Sixteen Sycamores Playground Citywide Buildings Reconstruction (CNYG-209M) Completed February 2015
Sixteen Sycamores Playground Brooklyn General Site Work (BG-1007M) Completed October 2013
South Oxford Park Brooklyn General Site Work (BG-711M) Completed June 2014
Sperandeo Brothers Playground Sperandeo Playground Sport Courts Reconstruction Completed November 2018
Spring Creek Park Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1) Completed June 2015
Spring Creek Park Citywide Steel Guiderails, Timber Rails and Fencing Installation (CNYG-1414M) Completed October 2018
St. John's Park Citywide Pool Structural Systems Reconstruction (CNYG-1011M) Completed June 2017
St. John's Park St. John's Park Sitting Area Reconstruction Completed May 2015
St. John's Park St. John's Recreation Center Comfort Station Construction Completed December 2018
St. Mary's Park St. Mary's Playground Multi-Purpose Area Reconstruction Completed July 2019
St. Mary's Park St. Mary's Playground Reconstruction Completed April 2018
Stockton Playground Jesse Owens, Stockton and Stroud Playgrounds Comfort Station Reconstruction Completed June 2019
Stockton Playground Stockton Playground Reconstruction Completed April 2018
Stroud Playground Jesse Owens, Stockton and Stroud Playgrounds Comfort Station Reconstruction Completed June 2019
Stroud Playground Stroud Playground Reconstruction Completed January 2019
Sumner Playground Citywide Electrical Systems Reconstruction (CNYG-914M) Completed March 2019
Sumner Playground Sumner Playground Reconstruction Completed October 2018
Sunset Park Citywide Pool Structural Systems Reconstruction (CNYG-1011M) Completed June 2017
Sunset Park Citywide Electrical Systems Reconstruction (CNYG-1611MA) Completed July 2017
Sunset Park Brooklyn and Staten Island Roofing Systems Reconstruction (CNYG-415M) Completed July 2017
Sunset Park Citywide Pool Electrical Systems Reconstruction (CNYG-815MA) Completed June 2019
Sunset Park Citywide Pool Plumbing Systems Reconstruction (CNYG-915M) Completed June 2019
Sunset Park Citywide Pool Structural Systems Reconstruction (CNYG-1015M) Completed June 2019
Sunset Park Citywide Plumbing Systems Reconstruction (CNYG-1711MA1) Completed June 2016
Sunset Park Sunset Park Adult Fitness Area Construction Completed December 2018
Sunset Park Sunset Park Pavement, Fencing, and Bench Reconstruction Completed December 2018
Sunset Park Sunset Park Playground Play Equipment and Safety Surfacing Reconstruction Completed July 2019
Sunset Park Sunset Park Playground Reconstruction Completed July 2017
Sunset Park Sunset Park Spray Shower Construction Completed October 2014
Sunset Park Sunset Park Spray Shower Reconstruction Completed May 2018
Surf Playground Surf Playground Reconstruction Completed June 2016
Taaffe Playground Taaffe Playground Reconstruction Completed September 2016
Ten Eyck Playground Ten Eyck Playground Reconstruction Completed April 2018
Thomas Boyland Park Thomas Boyland Park Reconstruction Completed August 2017
Thomas Greene Playground Thomas Greene Playground Pool Reconstruction Completed June 2017
Thomas Greene Playground Thomas Greene Playground Reconstruction Completed June 2015
Thomas J. Cuite Park Thomas J. Cuite Park Water Service Installation Completed February 2019
Tilden Playground Pulaski and Tilden Playground Tennis Court and Play Area Reconstruction Completed October 2013
Weeksville Playground Weeksville Playground Reconstruction Completed September 2019
Wingate Park Brooklyn and Staten Island General Roofing Systems Reconstruction (CNYG-1214MA) Completed February 2019
Wingate Park Wingate Park & Glenwood Playground Reconstruction Completed May 2016
Wingate Park Wingate Park Gym, Heckscher Playground, and Nautilus Playground Reconstruction Completed May 2017
Wingate Park Martin Luther King Jr. Playground Spray Shower, Ocean Hill Playground, and Wingate Park Playground Reconstruction Completed August 2017
Citywide Plumbing Systems Reconstruction (CNYG-1007M) Completed April 2014
Queens General Site Work (QG-713MA) Completed November 2016
Brooklyn Sandy-Related Tree Removal - Community Boards 1-6 Completed June 2015
Brooklyn Sandy-Related Tree Removal - Community Boards 7-18 Completed June 2016
Brooklyn Sandy-Related Tree Replacement Completed November 2015
Brooklyn Street Tree Planting & Invasive Species Removal FY11 Completed April 2014
Brooklyn Street Tree Planting FY10 - Community Board 2 Completed November 2013
Brooklyn Street Tree Planting FY10 (BG-810MA) Completed February 2014
Brooklyn Street Tree Planting FY11 - Community Boards 7,10-15,17,18 (BG-511MR) Completed April 2015
Brooklyn Street Tree Planting FY13 - Community Boards 1-6,8,9,16 Completed April 2014
Brooklyn Street Tree Planting FY13 - Community Boards 5,16,17,18 Completed March 2014
Brooklyn Street Tree Planting FY14 - Community Boards 1-6,8 Completed March 2015
Brooklyn Street Tree Planting FY14 - Community Boards 5,9,16,17,18 Completed March 2015
Brooklyn Street Tree Planting FY14 - Community Boards 7,10-15 Completed March 2015
Brooklyn Street Tree Planting FY15 - Community Boards 1-4 Completed April 2016
Brooklyn Street Tree Planting FY15 - Community Boards 11,13-15,18 Completed April 2016
Brooklyn Street Tree Planting FY15 - Community Boards 5,8,9,16,17 Completed July 2016
Brooklyn Street Tree Planting FY15 - Community Boards 6,7,10,12 Completed June 2016
Brooklyn Street Tree Planting FY16 - Community Boards 1-4 Completed January 2017
Brooklyn Street Tree Planting FY16 - Community Boards 11,13-15,18 Completed September 2017
Brooklyn Street Tree Planting FY16 - Community Boards 5,8,9,16,17 Completed January 2017
Brooklyn Street Tree Planting FY16 - Community Boards 6,7,10,12 Completed September 2017
Brooklyn Street Tree Planting FY17 - Community Boards 1-4,16 Completed January 2019
Brooklyn Street Tree Planting FY17 - Community Boards 11,13,15 Completed August 2018
Brooklyn Street Tree Planting FY17 - Community Boards 6,7,10,12 Completed July 2018
Brooklyn Street Tree Planting FY17 - Community Boards 8,9,17 Completed October 2018
PS 192 Playground Reconstruction Completed June 2014
PS 192 Playground Reconstruction Phase 2 Completed September 2015

Manhattan Projects

Park Project Phase Completion Date
Abraham Lincoln Playground Citywide Pool Structural Systems Reconstruction (CNYG-1011M) Completed June 2017
Alexander Hamilton Playground Manhattan Roofing Systems Reconstruction (MG-709M) Completed August 2015
Alfred E. Smith Playground Citywide Electrical Systems Reconstruction (CNYG-1611MA) Completed July 2017
Andrew Haswell Green Park Andrew Haswell Green Searail and Rooftop Sitting Area Construction Completed January 2017
Annunciation Playground Manhattan Roofing Systems Reconstruction (MG-215M) Completed March 2019
Asphalt Green Dekovats Playground Safety Surfacing Reconstruction Completed December 2018
Asser Levy Playground Citywide Pool Structural Systems Reconstruction (CNYG-1011M) Completed June 2017
Asser Levy Playground Manhattan Roofing Systems Reconstruction (MG-215M) Completed March 2019
Asser Levy Playground Asser Levy Playground Expansion Completed October 2014
Asser Levy Playground Asser Levy Recreation Center Boiler and Pool Dehumidifier Reconstruction Completed May 2017
Baruch Playground Manhattan Synthetic Turf Field Reconstruction Completed July 2019
Bellevue South Park Bellevue South Park Landscape Reconstruction Completed November 2013
Bleecker Playground Bleecker Playground and Comfort Station Reconstruction Completed August 2013
Bloomingdale Playground Bloomingdale Playground Comfort Station Reconstruction Completed September 2019
Bloomingdale Playground Bloomingdale Playground Play Area Reconstruction Completed October 2019
Booker T. Washington Playground Manhattan General Site Work (MG-914MA) Completed September 2018
Carmansville Playground Carmansville Playground Reconstruction Completed December 2017
Carmansville Playground Hunts Point, Playground 52, Carmansville, MLK, and Sol Lain Playgrounds Comfort Station Reconstruction Completed October 2018
Central Park Citywide Electrical Systems Reconstruction (CNYG-1611MA) Completed July 2017
Central Park Citywide Pool Plumbing Systems Reconstruction (CNYG-915M) Completed June 2019
Central Park Citywide Pool Structural Systems Reconstruction (CNYG-1015M) Completed June 2019
Central Park Arsenal Building Facade and Roof Reconstruction Completed September 2019
Central Park Arsenal Emergency Elevator Reconstruction Completed September 2017
Charlton Plaza Father Fagan Park Sitting Area Reconstruction and Charlton Plaza Water Service Installation Completed May 2018
Chelsea Green Chelsea Green Construction Completed July 2019
Chelsea Park Manhattan General Site Work (MG-914MA) Completed September 2018
Clement Clarke Moore Park Clement Clarke Moore Park Reconstruction Completed June 2019
Col. Young Playground Citywide Sandy-Related Recreational Lighting and Electrical Line Reconstruction Completed November 2013
Collect Pond Park Collect Pond Park Construction Completed November 2013
Columbus Park Manhattan General Site Work (MG-914MA) Completed September 2018
Corporal John A. Seravalli Playground Seravalli Playground Comfort Station Reconstruction Completed July 2019
De Witt Clinton Park Manhattan Synthetic Turf Field Reconstruction Completed July 2019
De Witt Clinton Park Manhattan General Site Work (MG-213M) Completed December 2016
De Witt Clinton Park Manhattan Roofing Systems Reconstruction (MG-614M) Completed September 2017
DeSalvio Playground DeSalvio Playground Reconstruction Completed February 2019
Dry Dock Playground Dry Dock Playground Reconstruction Completed December 2015
East River Esplanade Glick Park Electrical Systems Reconstruction (Hurricane Sandy) Completed June 2019
East River Playground Manhattan Roofing Systems Reconstruction (MG-709M) Completed August 2015
Father Fagan Park Father Fagan Park Sitting Area Reconstruction and Charlton Plaza Water Service Installation Completed May 2018
Fort Tryon Park Manhattan Roofing Systems Reconstruction (MG-709M) Completed August 2015
Fort Tryon Park Manhattan Roofing Systems Reconstruction (MG-614M) Completed September 2017
Fort Tryon Park Fort Tryon Park Fieldhouse Staircase Reconstruction Completed March 2018
Fort Tryon Park Fort Tryon Park Path and Stair Reconstruction Completed April 2015
Fort Washington Park Fort Washington Park Ballfields Reconstruction Completed October 2013
Fort Washington Park Fort Washington Park Courts Reconstruction and Playground Construction Completed October 2013
Fort Washington Park Fort Washington Park Dyckman Street Ramp Construction and Inwood Hill Park Entrance Reconstruction Completed June 2015
Fort Washington Park Fort Washington Park Greenway Construction Completed June 2014
Frederick Douglass Playground Manhattan Synthetic Turf Field Reconstruction Completed July 2019
Frederick Johnson Playground Frederick Johnson Park Tennis Courts Reconstruction Completed October 2013
Gertrude Ederle Recreation Center Citywide Pool Structural Systems Reconstruction (CNYG-1011M) Completed June 2017
Gertrude Ederle Recreation Center Citywide Buildings Reconstruction (CNYG-209M) Completed February 2015
Gertrude Ederle Recreation Center Gertrude Ederle Recreation Center Playground Reconstruction Completed September 2016
Hamilton Fish Park Citywide Electrical Systems Reconstruction (CNYG-1611MA) Completed July 2017
Hansborough Recreation Center Citywide Pool Structural Systems Reconstruction (CNYG-1011M) Completed June 2017
Hansborough Recreation Center Manhattan Roofing Systems Reconstruction (MG-709M) Completed August 2015
Hansborough Recreation Center Citywide Electrical Systems Reconstruction (CNYG-1611MA) Completed July 2017
Hansborough Recreation Center Hansborough Recreation Center Gym Floor and Window Reconstruction Completed November 2017
Hell's Kitchen Park Manhattan General Site Work (MG-213M) Completed December 2016
Henry M. Jackson Playground Henry M. Jackson Playground Reconstruction Completed June 2017
Highbridge Park Citywide Pool Structural Systems Reconstruction (CNYG-1011M) Completed June 2017
Highbridge Park Citywide Electrical Systems Reconstruction (CNYG-1611MA) Completed July 2017
Highbridge Park Citywide Plumbing Systems Reconstruction (CNYG-1007M) Completed April 2014
Highbridge Park Citywide Buildings Reconstruction (CNYG-209M) Completed February 2015
Highbridge Park Citywide Plumbing Systems Reconstruction (CNYG-1711MA1) Completed June 2016
Highbridge Park Highbridge Park Brush Stairway Reconstruction Completed February 2014
Howard Bennett Playground Manhattan Roofing Systems Reconstruction (MG-709M) Completed August 2015
Inwood Hill Park Citywide Plumbing Systems Reconstruction (CNYG-1007M) Completed April 2014
Inwood Hill Park Citywide Buildings Reconstruction (CNYG-209M) Completed February 2015
Inwood Hill Park Fort Washington Park Dyckman Street Ramp Construction and Inwood Hill Park Entrance Reconstruction Completed June 2015
Inwood Hill Park Inwood Hill Park Adult Fitness Equipment Construction Completed October 2018
Inwood Hill Park Inwood Hill Park Little League Baseball Field Reconstruction Completed May 2014
Inwood Hill Park Inwood Hill Park Nature Center Sewer Connection Construction Completed July 2018
Isham Park Isham Park Water System Reconstruction Completed April 2015
J. Hood Wright Park J. Hood Wright Park Adult Fitness Equipment Construction Completed December 2018
J. Hood Wright Park J. Hood Wright Park Recreation Center HVAC Reconstruction Completed June 2014
Jackie Robinson Park Citywide Pool Structural Systems Reconstruction (CNYG-1011M) Completed June 2017
Jackie Robinson Park Citywide Electrical Systems Reconstruction (CNYG-1611MA) Completed July 2017
Jackson Square Jane Street Garden Fence Construction and Jackson Square Park Reconstruction Completed February 2019
James J Walker Park James J. Walker Park Synthetic Turf Ballfield Construction Completed August 2013
James Madison Plaza James Madison Plaza Reconstruction Completed October 2013
James Weldon Johnson Playground James Weldon Johnson Playground Reconstruction Completed February 2018
John Jay Park Citywide Pool Plumbing Systems Reconstruction (CNYG-714M) Completed April 2018
John Jay Park Citywide Pool Electrical Systems Reconstruction (CNYG-815MA) Completed June 2019
John Jay Park Citywide Pool Plumbing Systems Reconstruction (CNYG-915M) Completed June 2019
John Jay Park Citywide Pool Structural Systems Reconstruction (CNYG-1015M) Completed June 2019
John Jay Park Tony Dapolito Recreation Center and John Jay Pool Boiler Systems Reconstruction (Hurricane Sandy) Completed February 2015
John V. Lindsay East River Park Citywide Electrical Systems Reconstruction (CNYG-907M) Completed October 2014
John V. Lindsay East River Park Manhattan Roofing Systems Reconstruction (MG-614M) Completed September 2017
John V. Lindsay East River Park East River Park East 6th Street Synthetic Turf Soccer Field & Running Track Reconstruction Completed September 2018
Marcus Garvey Park Citywide Pool Structural Systems Reconstruction (CNYG-1011M) Completed June 2017
Marcus Garvey Park Citywide Pool Electrical Systems Reconstruction (CNYG-815MA) Completed June 2019
Marcus Garvey Park Citywide Pool Plumbing Systems Reconstruction (CNYG-915M) Completed June 2019
Marcus Garvey Park Citywide Pool Structural Systems Reconstruction (CNYG-1015M) Completed June 2019
Marcus Garvey Park Marcus Garvey Park Fire Watchtower Dismantling Completed June 2015
Martin Luther King, Jr. Playground Hunts Point, Playground 52, Carmansville, MLK, and Sol Lain Playgrounds Comfort Station Reconstruction Completed October 2018
Martin Luther King, Jr. Playground Manhattan Roofing Systems Reconstruction (MG-614M) Completed September 2017
Martin Luther King, Jr. Playground Martin Luther King Jr. Playground Reconstruction Completed January 2018
Mathews-Palmer Playground Manhattan Roofing Systems Reconstruction (MG-614M) Completed September 2017
Mathews-Palmer Playground Mathews-Palmer Playground Reconstruction Completed April 2018
McCaffrey Playground Manhattan Roofing Systems Reconstruction (MG-614M) Completed September 2017
Morningside Park Manhattan Roofing Systems Reconstruction (MG-709M) Completed August 2015
Morningside Park Morningside Park 123rd Street Playground Reconstruction Phase 2 Completed March 2019
Morningside Park Morningside Park 123rd Street Playground Reconstruction Phase I Completed July 2013
Playground 103 CIII Playground 103 and St. Nicholas Playground North Reconstruction Completed May 2018
Playground Eighty Nine LXXXIX Playground Eighty Nine Reconstruction Completed January 2016
Playground One Twenty Five CXXV Manhattan Basketball Court Reconstruction Completed March 2018
Poor Richard's Playground Poor Richard's Playground Entry Path Reconstruction Completed August 2019
Ramon Aponte Park Ramon Aponte Park Reconstruction Completed June 2016
Randall's Island Park Randall's Island Emergency Utility Transformer Systems Reconstruction Completed January 2019
Randall's Island Park Randall's Island Western Shore Reconstruction Completed March 2019
Recreation Center 54 Citywide Pool Structural Systems Reconstruction (CNYG-1011M) Completed June 2017
Recreation Center 54 Manhattan Roofing Systems Reconstruction (MG-709M) Completed August 2015
Riverside Park Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1) Completed June 2015
Riverside Park Grant's Tomb Bluestone Pavement and St. Nicholas Park Dog Run Path and Steps Reconstruction Completed November 2018
Riverside Park Riverside Park 79th Street Boat Basin Dock A Reconstruction Completed June 2016
Riverside Park Riverside Park Fence and Pavement Reconstruction Completed December 2015
Riverside Park Riverside Park Path Reconstruction, West 72-83, 91-95, 122-125 Streets Completed June 2019
Riverside Park Riverside Park Tiemann Place Stairs and Sidewalk Reconstruction Completed June 2015
Riverside Park Riverside Park West 91st-96th Streets Sidewalk Reconstruction Completed October 2017
Riverside Park West 102nd Street Riverside Park Field House Water Service Installation Completed January 2019
Robert L. Clinkscales Playground and Community Garden Robert Clinkscales Playground and Community Garden Reconstruction Completed May 2014
Roger Morris Park Morris-Jumel Mansion Streetscape Reconstruction Completed February 2016
Samuel N. Bennerson 2nd Playground Bennerson Playground Reconstruction Completed January 2018
Sara D. Roosevelt Park Citywide Electrical Systems Reconstruction (CNYG-907M) Completed October 2014
Septuagesimo UNO Manhattan General Site Work (MG-213M) Completed December 2016
Seward Park Manhattan Roofing Systems Reconstruction (MG-614M) Completed September 2017
Seward Park Manhattan Basketball Court Reconstruction Completed March 2018
Sheltering Arms Playground Citywide Plumbing Systems Reconstruction (CNYG-1711MA1) Completed June 2016
Sherman Creek Sherman Creek Entrance, Path, and Fencing Construction Completed May 2014
Sol Lain Plgd Hunts Point, Playground 52, Carmansville, MLK, and Sol Lain Playgrounds Comfort Station Reconstruction Completed October 2018
Sol Lain Plgd Sol Lain Playground Reconstruction Completed September 2017
Spring Street Park Spring Street Park Reconstruction Completed September 2018
St. Gregory's Playground St. Gregory's Playground Reconstruction Completed September 2019
St. Nicholas Park Grant's Tomb Bluestone Pavement and St. Nicholas Park Dog Run Path and Steps Reconstruction Completed November 2018
St. Nicholas Playground North Playground 103 and St. Nicholas Playground North Reconstruction Completed May 2018
St. Nicholas Playground North St. Nicholas Playground North Comfort Station Reconstruction Completed May 2018
Stuyvesant Square Stuyvesant Square East Section Fence and Sidewalk Reconstruction Completed December 2016
Sutton Place Park Sutton Place Park Reconstruction Completed July 2019
The Battery Battery Park Comfort Station Reconstruction Completed September 2014
The Battery Battery Town Green and Battery Bikeway Construction Completed October 2015
Theodore Roosevelt Park Theodore Roosevelt Park Pavement Reconstruction Completed November 2013
Thomas Jefferson Park Manhattan Roofing Systems Reconstruction (MG-709M) Completed August 2015
Thomas Jefferson Park Citywide Electrical Systems Reconstruction (CNYG-1611MA) Completed July 2017
Thomas Jefferson Park Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1) Completed June 2015
Thomas Jefferson Park Manhattan Basketball Court Reconstruction Completed March 2018
Thomas Jefferson Park Thomas Jefferson Park East Harlem Skate Park Construction Completed September 2017
Thomas Jefferson Park Thomas Jefferson Park Irrigation Installation Completed September 2019
Tompkins Square Park Tompkins Square Playground Reconstruction Completed September 2019
Tony Dapolito Recreation Center Citywide Electrical Systems Reconstruction (CNYG-1611MA) Completed July 2017
Tony Dapolito Recreation Center Tony Dapolito Recreation Center and John Jay Pool Boiler Systems Reconstruction (Hurricane Sandy) Completed February 2015
Trygve Lie Plaza Trygve Lie Plaza Sitting Area Reconstruction Completed June 2016
Wagner Houses Pool Citywide Pool Structural Systems Reconstruction (CNYG-1011M) Completed June 2017
Wards Island Park Randall's Island Hell Gate Pathway Construction Completed August 2016
Washington Square Park Washington Square Park Perimeter Sidewalk Reconstruction Completed October 2016
White Playground White Playground Reconstruction Completed June 2016
Wright Brothers Playground Manhattan Roofing Systems Reconstruction (MG-709M) Completed August 2015
Manhattan General Site Work (MG-213M) Completed December 2016
Jane Street Garden Fence Construction and Jackson Square Park Reconstruction Completed February 2019
La Plaza Cultural Community Garden Reconstruction Completed July 2019
Manhattan Sandy-Related Tree Removal Completed June 2016
Manhattan Sandy-Related Tree Replacement Completed December 2015
Manhattan Street Tree Planting FY13 Completed January 2014
Manhattan Street Tree Planting FY14 Completed February 2015
Manhattan Street Tree Planting FY15 Completed March 2016
Manhattan Street Tree Planting FY16 Completed June 2017
Manhattan Street Tree Planting FY17 Completed October 2018
Second Avenue Subway Street Tree Planting Restitution for Removed Trees Completed June 2016

Queens Projects

Park Project Phase Completion Date
A.R.R.O.W. REC CENTER Arrow Recreation Center Playground Reconstruction Completed March 2018
Alley Athletic Playground Queens General Site Work (QG-613M) Completed November 2016
Alley Athletic Playground Queens General Site Work (QG-711M) Completed August 2013
Alley Pond Park Alley Pond Park Paths and Drainage Reconstruction Completed August 2015
Alley Pond Park Citywide Electrical Systems Reconstruction (CNYG-907M) Completed October 2014
Alley Pond Park Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1) Completed June 2015
Alley Pond Park Citywide Plumbing Systems Reconstruction (CNYG-1007M) Completed April 2014
Alley Pond Park Queens General Site Work (QG-713MA) Completed November 2016
Annadale Playground Queens General Site Work (QG-1011M) Completed July 2014
Astoria Health Playground Astoria Health Playground Reconstruction Completed March 2019
Astoria Heights Playground Queens General Site Work (QG-1011M) Completed July 2014
Astoria Heights Playground Astoria Heights and Bowne Playground Comfort Station Reconstruction Completed July 2018
Astoria Heights Playground Astoria Heights-JHS10 Playground Reconstruction Completed May 2018
Astoria Park Citywide Pool Structural Systems Reconstruction (CNYG-1011M) Completed June 2017
Astoria Park Citywide Electrical Systems Reconstruction (CNYG-1611MA) Completed July 2017
Astoria Park Astoria Park Track and Field Reconstruction Completed October 2019
Astoria Park Citywide Ballfield Lighting Installation (CNYG-2815M) Completed July 2018
Astoria Park Queens East River and North Shore Greenway Construction Completed September 2013
Athens Square Athens Square Playground Plaza Reconstruction Completed August 2014
Baisley Pond Park Baisley Pond Park Pathway Reconstruction Completed May 2016
Baisley Pond Park Queens Athletic Courts Reconstruction (QG-216M) Completed July 2019
Bayswater Park Laurelton Playground and Bayswater Park Skate Elements and Seating Areas Construction Completed November 2018
Beach 59th St Playground Bronx and Queens Roofing Systems Reconstruction (CNYG-1114M) Completed April 2019
Beach Channel Playground Beach Channel (P.S. 183) Playground Reconstruction Completed March 2014
Big Bush Playground Big Bush Park Playground Reconstruction Completed May 2018
Bowne Park Bowne Park Bocce Court Construction Completed August 2013
Bowne Park Bowne Park Playground Reconstruction Completed August 2017
Bowne Park Queens General Comfort Station and Facility Reconstruction (QG-1413MA) Completed June 2018
Bowne Playground Astoria Heights and Bowne Playground Comfort Station Reconstruction Completed July 2018
Bowne Playground Bowne Playground Reconstruction Completed April 2019
Brinkerhoff Mall Queens General Site Work (QG-1216M) Completed November 2018
Broad Channel Park Queens General Site Work (QG-1216M) Completed November 2018
Brookville Park Queens General Site Work (QG-613M) Completed November 2016
Brookville Park Brookville Park Picnic Area Reconstruction and Tennis Courts Construction Completed July 2018
Brookville Park Queens General Site Work (QG-1116M) Completed December 2018
Cambria Playground Nautilus, Walter Ward, and Cambria Playgrounds Basketball and Handball Courts Reconstruction Completed March 2017
Captain Tilly Park Captain Tilly Park Landscape and Drainage Reconstruction Completed November 2015
Captain Tilly Park Captain Tilly Park Plaza Reconstruction Completed October 2017
College Point Fields Queens Roller Hockey Rinks Reconstruction Completed August 2019
College Point Park Queens General Site Work (QG-1813M) Completed January 2016
Conch Playground Conch Playground Reconstruction Completed January 2018
Corona Golf Playground Bronx and Queens Roofing Systems Reconstruction (CNYG-315MA) Completed October 2018
Corona Golf Playground Junction and Corona Golf Playground Play Equipment Installation (QG-615M) Completed April 2017
Crocheron Park Junction and Corona Golf Playground Play Equipment Installation (QG-615M) Completed April 2017
Cross Island Parkway Bayside Marina Electrical Systems Reconstruction (Hurricane Sandy) Completed May 2019
Cross Island Parkway Joe Michael's Mile Reconstruction Completed August 2018
Crosson Park Queens General Site Work (QG-1011M) Completed July 2014
Crowley Playground Queens General Site Work (QG-1313M) Completed February 2018
Cunningham Park Queens General Site Work (QG-711M) Completed August 2013
Cunningham Park Queens General Site Work (QG-1216M) Completed November 2018
Cunningham Park Cunningham Park Ballfields 2-4 Reconstruction Completed July 2013
Cunningham Park Cunningham Park Picnic Area Reconstruction and Performance Area Construction Completed September 2018
Daniel M. O'Connell Playground O'Connell Playground Recreation Building Reconstruction Completed April 2019
Detective Keith L Williams Park Queens General Comfort Station and Facility Reconstruction (QG-1513MA1) Completed September 2018
Detective Keith L Williams Park Queens General Site Work (QG-513M) Completed February 2016
Douglaston Park Golf Course Douglaston Golf Course Net Barrier Installation Completed July 2014
Dunningham Triangle Dunningham Triangle and Playground Ninety Basketball Court and Spray Shower Reconstruction Completed June 2016
Dutch Kills Playground Bronx and Queens Roofing Systems Reconstruction (CNYG-3009M) Completed June 2015
Dutch Kills Playground Dutch Kills Playground and Court Area Reconstruction Completed May 2019
East Elmhurst Playground Bronx and Queens Roofing Systems Reconstruction (CNYG-315MA) Completed October 2018
East Elmhurst Playground Queens General Comfort Station and Facility Reconstruction (QG-1613MA) Completed June 2018
Ehrenreich-Austin Playground Austin, Giovanelli, and Utopia Playgrounds Reconstruction Completed December 2017
Ehrenreich-Austin Playground Ehrenreich-Austin Playground Comfort Station Electrical System Reconstruction Completed January 2019
Ehrenreich-Austin Playground Ehrenreich-Austin Playground Comfort Station Plumbing System Reconstruction Completed January 2019
Ehrenreich-Austin Playground Ehrenreich-Austin Playground Comfort Station Reconstruction Completed January 2019
Elmhurst Park Queens General Site Work (QG-613M) Completed November 2016
Evergreen Park Bronx and Queens Roofing Systems Reconstruction (CNYG-3009M) Completed June 2015
Evergreen Park Evergreen Park Playground and Spray Shower Reconstruction Completed June 2016
Evergreen Park Evergreen Park Playground Reconstruction Completed January 2019
Fisher Pool Citywide Pool Electrical Systems Reconstruction (CNYG-815MA) Completed June 2019
Fisher Pool Citywide Pool Plumbing Systems Reconstruction (CNYG-915M) Completed June 2019
Fisher Pool Citywide Pool Structural Systems Reconstruction (CNYG-1015M) Completed June 2019
Flushing Fields Bronx and Queens Roofing Systems Reconstruction (CNYG-3009M) Completed June 2015
Flushing Fields Memorial Field of Flushing Ballfield Reconstruction Completed October 2013
Flushing Meadows Corona Park Bronx and Queens Roofing Systems Reconstruction (CNYG-1114M) Completed April 2019
Flushing Meadows Corona Park Citywide Electrical Systems Reconstruction (CNYG-1611MA) Completed July 2017
Flushing Meadows Corona Park Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1) Completed June 2015
Flushing Meadows Corona Park Queens General Site Work (QG-1011M) Completed July 2014
Flushing Meadows Corona Park Bronx and Queens Roofing Systems Reconstruction (CNYG-3009M) Completed June 2015
Flushing Meadows Corona Park Citywide Pool Plumbing Systems Reconstruction (CNYG-714M) Completed April 2018
Flushing Meadows Corona Park Citywide Buildings Reconstruction (CNYG-209M) Completed February 2015
Flushing Meadows Corona Park Flushing Meadows Corona Park Fields 2,3,5 Reconstruction Completed July 2013
Flushing Meadows Corona Park Flushing Meadows Corona Park Lawrence Playground Reconstruction Completed May 2019
Flushing Meadows Corona Park Flushing Meadows Corona Park Meadow Lake Habitat Restoration Completed May 2016
Flushing Meadows Corona Park Flushing Meadows Corona Park Meadow Lake Promenade Reconstruction Completed April 2019
Flushing Meadows Corona Park Flushing Meadows Corona Park Pavement and Fence Reconstruction Completed September 2013
Flushing Meadows Corona Park Flushing Meadows Corona Park Pool Emergency Roof Reconstruction Completed October 2017
Flushing Meadows Corona Park Flushing Meadows Corona Park Pool Locker Room Reconstruction Completed October 2017
Flushing Meadows Corona Park Flushing Meadows Corona Park Roosevelt Avenue Entrance Reconstruction Completed June 2018
Flushing Meadows Corona Park Flushing Meadows Corona Park Synthetic Turf Field 1 Reconstruction Completed July 2015
Flushing Meadows Corona Park Queens General Site Work (QG-212M) Completed October 2016
Flushing Meadows Corona Park World's Fair Playground Asphalt Field Reconstruction Completed June 2019
Forest Park Citywide Electrical Systems Reconstruction (CNYG-1611MA) Completed July 2017
Forest Park Queens General Site Work (QG-613M) Completed November 2016
Forest Park Bronx and Queens Roofing Systems Reconstruction (CNYG-3009M) Completed June 2015
Forest Park Queens General Site Work (QG-1216M) Completed November 2018
Forest Park Bronx and Queens Roofing Systems Reconstruction (CNYG-315MA) Completed October 2018
Forest Park Austin, Giovanelli, and Utopia Playgrounds Reconstruction Completed December 2017
Forest Park Citywide Steel Guiderails, Timber Rails and Fencing Installation (CNYG-1414M) Completed October 2018
Forest Park Forest Park T-Ball Field and The Overlook Drainage System Reconstruction Completed June 2016
Forest Park Joe Devoy Playground Reconstruction Completed January 2017
Forest Park Mary Whalen Playground Reconstruction Completed May 2016
Forest Park Oakridge Turn/Forest Park Drive Reconstruction Completed September 2017
Forest Park Queens General Site Work (QG-915M) Completed November 2016
Fort Totten Park Citywide Electrical Systems Reconstruction (CNYG-907M) Completed October 2014
Fort Totten Park Citywide Plumbing Systems Reconstruction (CNYG-1007M) Completed April 2014
Fort Totten Park Queens General Site Work (QG-713MA) Completed November 2016
Fort Totten Park Junction and Corona Golf Playground Play Equipment Installation (QG-615M) Completed April 2017
Fort Totten Park Queens General Site Work (QG-915M) Completed November 2016
Fort Totten Park Bayside Historical Society Officers Club Porch Reconstruction Completed March 2019
Fort Totten Park Bronx, Manhattan and Queens Reforestation FY15 Completed October 2017
Fort Totten Park Fort Totten Park Building 429 Roof Reconstruction Completed February 2017
Fort Totten Park Fort Totten Park Seawall Reconstruction Completed August 2014
Frank D. O'Connor Playground Queens General Site Work (QG-1313M) Completed February 2018
Frank Principe Park Frank Principe Park Ballfields Reconstruction Completed November 2018
Frederick B. Judge Playground Citywide Ballfield Lighting Installation (CNYG-2815M) Completed July 2018
Frederick B. Judge Playground Queens General Comfort Station and Facility Reconstruction (QG-1513MA1) Completed September 2018
Frederick B. Judge Playground Frederick B. Judge Playground Basketball Courts Reconstruction Completed May 2016
Freedom Square Playground Queens General Site Work (QG-1011M) Completed July 2014
Frontera Park Queens General Site Work (QG-413M) Completed July 2017
Grassmere Playground Grassmere Playground Reconstruction Completed November 2017
Haggerty Park Citywide Ballfield Lighting Installation (CNYG-2815M) Completed July 2018
Hallets Cove Playground Queens East River and North Shore Greenway Construction Completed September 2013
Hammel Playground Citywide Electrical Systems Reconstruction (CNYG-907M) Completed October 2014
Hammel Playground Citywide Plumbing Systems Reconstruction (CNYG-1007M) Completed April 2014
Hammel Playground Citywide Buildings Reconstruction (CNYG-209M) Completed February 2015
Harvard Playground Queens Athletic Courts Reconstruction (QG-216M) Completed July 2019
Harvey Park Queens Roller Hockey Rinks Reconstruction Completed August 2019
Hempstead Bench Spread Queens General Site Work (QG-811M) Completed September 2013
Hermon A. MacNeil Park Queens General Site Work (QG-513M) Completed February 2016
Hermon A. MacNeil Park Queens General Site Work (QG-915M) Completed November 2016
Hermon A. MacNeil Park Queens General Site Work (QG-811M) Completed September 2013
Hermon A. MacNeil Park MacNeil Park Esplanade Reconstruction Completed May 2019
Highland Park Bronx and Queens Roofing Systems Reconstruction (CNYG-1114M) Completed April 2019
Highland Park Queens General Site Work (QG-613M) Completed November 2016
Highland Park Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1) Completed June 2015
Highland Park Citywide Steel Guiderails, Timber Rails and Fencing Installation (CNYG-1414M) Completed October 2018
Highland Park Highland Park Ballfields 1 & 2 Reconstruction Completed May 2016
Highland Park Highland Park Basketball Courts Reconstruction Completed February 2019
Highland Park Highland Park Perimeter Pathways, Fencing and Security Lighting Reconstruction Completed September 2013
Highland Park Queens General Site Work (QG-913M) Completed July 2015
Hinton Park Hinton Park Reconstruction Completed July 2016
Hoffman Park Bronx and Queens Roofing Systems Reconstruction (CNYG-3009M) Completed June 2015
Holy Cow Playground Queens General Site Work (QG-913M) Completed July 2015
Howard Von Dohlen Playground Von Dohlen Playground Adult Fitness and Skate Area Construction and Ballfield Reconstruction Completed April 2016
Hoyt Playground Queens General Site Work (QG-514MA) Completed April 2017
Idlewild Park Idlewild Park Forest Restoration and Tree Planting Completed December 2018
Joseph Austin Playground Joseph Austin Playground Synthetic Turf Field Reconstruction Completed June 2018
Judge Moses Weinstein Playground Queens General Site Work (QG-713MA) Completed November 2016
Judge Moses Weinstein Playground Bronx and Queens Roofing Systems Reconstruction (CNYG-3009M) Completed June 2015
Junction Playground Junction and Corona Golf Playground Play Equipment Installation (QG-615M) Completed April 2017
Juniper Valley Park Queens Roller Hockey Rinks Reconstruction Completed August 2019
Juniper Valley Park Juniper Valley Park Bocce Court Construction Completed September 2014
Juniper Valley Park Juniper Valley Park Spray Shower Reconstruction Completed October 2019
Kissena Corridor Park Bronx and Queens Roofing Systems Reconstruction (CNYG-1114M) Completed April 2019
Kissena Corridor Park Kissena Corridor Park Path Construction Completed July 2018
Kissena Corridor Park Silent Spring Playground Reconstruction Completed December 2018
Kissena Park Queens General Comfort Station and Facility Reconstruction (QG-1613MA) Completed June 2018
Kissena Park Citywide Steel Guiderails, Timber Rails and Fencing Installation (CNYG-1414M) Completed October 2018
Kissena Park Queens General Site Work (QG-811M) Completed September 2013
L/CPL Thomas P. Noonan Jr. Playground Queens General Site Work (QG-513M) Completed February 2016
L/CPL Thomas P. Noonan Jr. Playground Noonan Playground Spray Shower and Playground Reconstruction Completed March 2015
Lanett Playground Lanett Playground Reconstruction and Comfort Station Construction Completed April 2014
Laurelton Parkway Laurelton West Playground Reconstruction Completed June 2014
Laurelton Playground Laurelton Playground and Bayswater Park Skate Elements and Seating Areas Construction Completed November 2018
Lawrence Virgilio Playground Citywide Pool Plumbing Systems Reconstruction (CNYG-915M) Completed June 2019
Lawrence Virgilio Playground Citywide Pool Structural Systems Reconstruction (CNYG-1015M) Completed June 2019
Lawrence Virgilio Playground Queens General Site Work (QG-413M) Completed July 2017
Little Bay Park Queens General Site Work (QG-1116M) Completed December 2018
Little Bay Park Little Bay Park Soccer Fields Reconstruction Completed May 2017
Little Bay Park Little Bay Parking Lot Reconstruction and Comfort Station Construction Completed January 2016
Locust Grove Civic Triangle Queens General Site Work (QG-811M) Completed September 2013
Lost Battalion Hall Recreation Center Citywide Electrical Systems Reconstruction (CNYG-1611MA) Completed July 2017
Lost Battalion Hall Recreation Center Bronx and Queens Roofing Systems Reconstruction (CNYG-3009M) Completed June 2015
Lost Battalion Hall Recreation Center Brooklyn and Queens Recreation and Nature Centers HVAC Systems Reconstruction (CNYG-1910MA1) Completed October 2018
Louis Armstrong Community Center Louis Armstrong Center HVAC Center Reconstruction Completed August 2013
Louis Armstrong Playground Citywide Plumbing Systems Reconstruction (CNYG-1007M) Completed April 2014
Louis C. Moser Playground Louis C. Moser Park Playground Reconstruction Completed September 2018
Mafera Park Queens Roller Hockey Rinks Reconstruction Completed August 2019
Marconi Park Marconi Park Playground Reconstruction Completed June 2016
Margaret I. Carman Green - Weeping Beech Bowne House Restoration Completed November 2014
Marie Curie Playground Citywide Pool Plumbing Systems Reconstruction (CNYG-915M) Completed June 2019
Marie Curie Playground Citywide Pool Structural Systems Reconstruction (CNYG-1015M) Completed June 2019
Murray Playground Murray Playground Dog Run and Sitting Area Reconstruction Completed June 2014
Newtown Playground Newtown Playground Reconstruction Completed September 2019
Norelli-Hargreaves Playground Norelli-Hargreaves Playground Reconstruction Completed September 2019
Overlook Park Overlook Park Seating Area Reconstruction Completed September 2019
Park at Beach 108 Street Beach 108 - Beach Channel Drive Sidewalk Reconstruction Completed April 2017
Pat Williams Playground Queens General Site Work (QG-614MA) Completed May 2017
Paul Raimonda Playground Raimonda Playground Reconstruction Completed May 2016
Plaut Triangle Queens General Site Work (QG-1813M) Completed January 2016
Playground Ninety Dunningham Triangle and Playground Ninety Basketball Court and Spray Shower Reconstruction Completed June 2016
Police Officer Nicholas Demutiis Park Queens General Site Work (QG-713MA) Completed November 2016
Police Officer Nicholas Demutiis Park Queens Athletic Courts Reconstruction (QG-216M) Completed July 2019
Police Officer Nicholas Demutiis Park Demutiis Park Playground Reconstruction Completed August 2017
Poppenhusen Playground Bronx and Queens Roofing Systems Reconstruction (CNYG-315MA) Completed October 2018
Queens Village Veterans Plaza Queens General Site Work (QG-1011M) Completed July 2014
Queensbridge Park Queens East River and North Shore Greenway Construction Completed September 2013
Rainey Park Bronx and Queens Roofing Systems Reconstruction (CNYG-3009M) Completed June 2015
Rainey Park Queens East River and North Shore Greenway Construction Completed September 2013
Ralph Demarco Park Queens East River and North Shore Greenway Construction Completed September 2013
Real Good Playground Queens General Site Work (QG-1313M) Completed February 2018
Reiff Playground Queens General Site Work (QG-1011M) Completed July 2014
Reiff Playground Queens General Comfort Station and Facility Reconstruction (QG-1513MA1) Completed September 2018
Rochdale Park Bronx and Queens Roofing Systems Reconstruction (CNYG-3009M) Completed June 2015
Rockaway Beach Rockaway Beach Lifeguard Trailer Furnishing and Installation Completed June 2017
Rockaway Beach Boardwalk Queens General Site Work (QG-711M) Completed August 2013
Rockaway Beach Boardwalk Sandpiper Playground Reconstruction Completed October 2019
Rockaway Beach and Boardwalk Rockaway Beach Emergency Protective Measures (Hurricane Sandy) Completed November 2013
Rockaway Community Park Queens General Site Work (QG-915M) Completed November 2016
Rockaway Freeway Queens General Site Work (QG-915M) Completed November 2016
Rory Staunton Field Travers Park and Staunton Field Reconstruction Completed August 2019
Roy Wilkins Recreation Center Queens General Site Work (QG-711M) Completed August 2013
Roy Wilkins Recreation Center Citywide Ballfield Lighting Installation (CNYG-2815M) Completed July 2018
Roy Wilkins Recreation Center Nautilus, Walter Ward, and Cambria Playgrounds Basketball and Handball Courts Reconstruction Completed March 2017
Roy Wilkins Recreation Center Queens General Site Work (QG-212M) Completed October 2016
Roy Wilkins Recreation Center Queens General Site Work (QG-614MA) Completed May 2017
Roy Wilkins Recreation Center Roy Wilkins Park Performance Area Reconstruction Completed May 2019
Roy Wilkins Recreation Center Roy Wilkins Park Track and Field Reconstruction Completed November 2018
Roy Wilkins Recreation Center Roy Wilkins Recreation Center Kitchen and Roof Reconstruction Completed August 2019
Rufus King Park Queens General Site Work (QG-613M) Completed November 2016
Rufus King Park Rufus King Park Gazebo Reconstruction Completed November 2016
Ruoff Triangle Ruoff Triangle Reconstruction Completed September 2017
Sean's Place Sean's Place Reconstruction Completed September 2017
Simeone Park Louis Simeone Park Reconstruction Completed January 2018
Sorrentino Recreation Center Sorrentino Recreation Center Boiler Reconstruction and HVAC Construction Completed December 2018
Sorrentino Recreation Center Sorrentino Recreation Center Reconstruction Completed March 2019
South Rochdale Playground Queens General Site Work (QG-811M) Completed September 2013
Springfield Park Queens General Comfort Station and Facility Reconstruction (QG-1413MA) Completed June 2018
Springfield Park Queens General Site Work (QG-1116M) Completed December 2018
Springfield Park North Queens General Comfort Station and Facility Reconstruction (QG-1413MA) Completed June 2018
St. Albans Park Queens General Site Work (QG-614MA) Completed May 2017
Sunset Cove Park Sunset Cove Park Saltwater Marsh and Coastal Upland Construction Completed June 2019
Travers Park Travers Park and Staunton Field Reconstruction Completed August 2019
Triborough Bridge Playground C Triborough Bridge Playground C Reconstruction Completed March 2019
Utopia Playground Austin, Giovanelli, and Utopia Playgrounds Reconstruction Completed December 2017
Van Alst Playground Van Alst Playground Reconstruction Completed June 2017
Veterans Grove Veterans Grove Reconstruction Completed February 2017
Walter Ward Playground Nautilus, Walter Ward, and Cambria Playgrounds Basketball and Handball Courts Reconstruction Completed March 2017
Whitestone Playground Queens General Site Work (QG-1011M) Completed July 2014
Whitey Ford Field Citywide Ballfield Lighting Installation (CNYG-2815M) Completed July 2018
Yellowstone Park Queens General Site Work (QG-212M) Completed October 2016
Queens General Site Work (QG-1116M) Completed December 2018
Queens General Site Work (QG-513M) Completed February 2016
Queens General Site Work (QG-514MA) Completed April 2017
44th Drive Pier Reconstruction Completed August 2016
Flushing Meadows Corona Park Street Tree Planting Restitution for USTA Construction Completed July 2015
Goodwill Park Common Green Plaza Construction Completed December 2013
PS 38 Playground Reconstruction Completed January 2014
Queens Green Infrastructure Construction (QG-813M) Completed September 2016
Queens Sandy-Related Tree Removal - Community Boards 1-5 Completed August 2015
Queens Sandy-Related Tree Removal - Community Boards 6-14 Completed July 2015
Queens Sandy-Related Tree Replacement Completed March 2016
Queens Street Tree Planting FY13 - Community Boards 1-8 Completed March 2014
Queens Street Tree Planting FY13 - Community Boards 10,12-14 Completed August 2014
Queens Street Tree Planting FY13 - Community Boards 7-9,11 (QG-113M) Completed March 2014
Queens Street Tree Planting FY14 - Community Boards 1-6 Completed March 2015
Queens Street Tree Planting FY14 - Community Boards 10,12-14 Completed February 2015
Queens Street Tree Planting FY14 - Community Boards 7-9,11 Completed May 2015
Queens Street Tree Planting FY15 - Community Boards 1-6 Completed April 2016
Queens Street Tree Planting FY15 - Community Boards 7,8,11,12 Completed April 2016
Queens Street Tree Planting FY15 - Community Boards 9,10,13,14 Completed October 2016
Queens Street Tree Planting FY16 - Community Boards 1-6 Completed May 2017
Queens Street Tree Planting FY16 - Community Boards 7,8,11,12 Completed May 2017
Queens Street Tree Planting FY16 - Community Boards 9,10,13,14 Completed April 2017
Queens Street Tree Planting FY17 - Community Boards 1-5 Completed June 2018
Queens Street Tree Planting FY17 - Community Boards 12,13,14 Completed June 2018
Queens Street Tree Planting FY17 - Community Boards 6,9,10 Completed June 2018
Queens Street Tree Planting FY17 - Community Boards 7,8,11 Completed September 2018

Staten Island Projects

Park Project Phase Completion Date
Alice Austen Park Alice Austen Park Buono Beach Paths and Rails Reconstruction Completed July 2016
Alice Austen Park Alice Austen Park McFarlane-Bredt House Reconstruction Completed December 2013
Alice Austen Park Buono Beach and Alice Austen Park Reconstruction (Hurricane Sandy) Completed June 2019
Alice Austen Park Staten Island Clean-Up and Safe-Up of Beaches and Parks (Hurricane Sandy) Completed July 2013
Arrochar Playground Arrochar Playground and Grandview Playground Comfort Station Reconstruction Completed February 2019
Arrochar Playground Arrochar Playground Pavement Reconstruction Completed November 2015
Arrochar Playground Arrochar Playground Reconstruction Completed March 2018
Austin J. McDonald Playground Austin J. McDonald Park Playground and Multi-Use Area Reconstruction Completed May 2018
Blood Root Valley Citywide Sandy-Related Recreational Lighting and Electrical Line Reconstruction Completed November 2013
Blood Root Valley Staten Island Greenbelt Recreation Center Parking Area Expansion Completed April 2019
CPL. Thompson Park Brooklyn and Staten Island Roofing Systems Reconstruction (CNYG-3109M) Completed June 2014
CPL. Thompson Park Citywide Pool Electrical Systems Reconstruction (CNYG-815MA) Completed June 2019
CPL. Thompson Park Staten Island General Site Work (RG-1013M) Completed December 2016
Carlton Park Carlton Park Landscape and Ida Court Playground Reconstruction Completed September 2019
Christopher J. Igneri Playground Christopher J. Igneri Playground Reconstruction Completed September 2017
Clove Lakes Park Brooklyn and Staten Island Roofing Systems Reconstruction (CNYG-415M) Completed July 2017
Clove Lakes Park Clove Lakes Park Parking Lot Reconstruction Completed February 2019
Clove Lakes Park Staten Island General Site Work (RG-913M) Completed August 2015
Clove Lakes Park Stonehenge Boiler and Heating Systems Reconstruction Completed June 2014
Conference House Park Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1) Completed June 2015
Conference House Park Conference House Beach Temporary Berm Reconstruction Completed August 2016
Conference House Park Conference House Park Beaches Emergency Protective Measures (Hurricane Sandy) Completed February 2015
Conference House Park Conference House Park Lenape Playground Reconstruction Completed December 2016
Conference House Park Conference House Park Path, Rail, and Landscape Reconstruction (Hurricane Sandy) Completed January 2019
Conference House Park Conference House Park Timber Barrier Rail Reconstruction Completed December 2016
Conference House Park Conference House Park Visitor Center Restroom Accessibility Reconstruction Completed November 2017
Conference House Park Staten Island Building Demolition (Hurricane Sandy) Completed March 2016
Conference House Park Staten Island General Site Work (RG-713M) Completed March 2015
Conference House Park Staten Island South Emergency Protective Measures (Hurricane Sandy) Completed December 2013
Crescent Beach Park Staten Island South Emergency Protective Measures (Hurricane Sandy) Completed December 2013
Crescent Beach Park Crescent Beach Park Barrier Berm Reconstruction Completed October 2016
De Matti Park Brooklyn and Staten Island Roofing Systems Reconstruction (CNYG-3109M) Completed June 2014
De Matti Park DeMatti Park Reconstruction Completed February 2018
Dugan Playground Staten Island General Site Work (RG-1013M) Completed December 2016
Dugan Playground Schmul Park and Dugan Playground Ballfield Reconstruction Completed June 2017
Faber Pool and Park Brooklyn and Staten Island Roofing Systems Reconstruction (CNYG-3109M) Completed June 2014
Faber Pool and Park Citywide Plumbing Systems Reconstruction (CNYG-1711MA1) Completed June 2016
Faber Pool and Park Faber Park Safety Surfacing Reconstruction Completed May 2015
Faber Pool and Park Faber Park Skate Park Construction Completed January 2015
Faber Pool and Park Faber Pool and Lyons Pool Boiler Reconstruction Completed July 2018
Franklin D. Roosevelt Boardwalk and Beach Staten Island Clean-Up and Safe-Up of Beaches and Parks (Hurricane Sandy) Completed July 2013
Franklin D. Roosevelt Boardwalk and Beach Brooklyn and Staten Island Roofing Systems Reconstruction (CNYG-3109M) Completed June 2014
Franklin D. Roosevelt Boardwalk and Beach Staten Island General Site Work (RG-913M) Completed August 2015
Franklin D. Roosevelt Boardwalk and Beach Staten Island General Site Work (RG-713M) Completed March 2015
Franklin D. Roosevelt Boardwalk and Beach Freedom Circle/Midland Beach Temporary Berm Reconstruction Completed October 2016
Franklin D. Roosevelt Boardwalk and Beach Midland Beach and Oakwood Beach Emergency Berm Installation Completed April 2014
Franklin D. Roosevelt Boardwalk and Beach Midland Beach Landscape and Drainage Reconstruction Completed May 2019
Franklin D. Roosevelt Boardwalk and Beach Midland Beach Recreation Building Construction Completed October 2013
Franklin D. Roosevelt Boardwalk and Beach South Beach Playland Playground Curbs and Fencing Reconstruction Completed May 2015
Franklin D. Roosevelt Boardwalk and Beach Staten Island Emergency Protective Measures (Hurricane Sandy) Completed December 2013
Freshkills Park Staten Island Building Demolition (Hurricane Sandy) Completed March 2016
Freshkills Park Fresh Kills Park Owl Hollow Fields Reconstruction Completed November 2016
Freshkills Park Freshkills Park Zink House Roof Reconstruction Completed September 2017
Freshkills Park New Springville Greenway Construction Completed July 2015
Freshkills Park Owl Hollow Fields Construction Completed July 2013
Gen. Douglas MacArthur Park Citywide Pool Electrical Systems Reconstruction (CNYG-815MA) Completed June 2019
Gen. Douglas MacArthur Park Citywide Pool Plumbing Systems Reconstruction (CNYG-915M) Completed June 2019
Gen. Douglas MacArthur Park Citywide Pool Structural Systems Reconstruction (CNYG-1015M) Completed June 2019
Graniteville Quarry Park Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1) Completed June 2015
Great Kills Park Staten Island Clean-Up and Safe-Up of Beaches and Parks (Hurricane Sandy) Completed July 2013
Great Kills Park Staten Island Building Demolition (Hurricane Sandy) Completed March 2016
Great Kills Park Staten Island General Site Work (RG-713M) Completed March 2015
Great Kills Park Midland Beach and Oakwood Beach Emergency Berm Installation Completed April 2014
Great Kills Park Staten Island Emergency Protective Measures (Hurricane Sandy) Completed December 2013
Great Kills Park Cedar Grove Beach Access Improvements Completed May 2015
Great Kills Park Cedar Grove Beach Freshwater Wetlands Reconstruction and Planting Completed January 2017
Great Kills Park New Dorp Beach Site Restoration in Great Kills Park (Hurricane Sandy) Completed February 2019
Great Kills Park New Dorp Beach Temporary Berm Reconstruction Completed June 2016
Great Kills Park New Dorp Center Interior Reconstruction (Hurricane Sandy) Completed August 2019
Greenbelt Native Plant Center Brooklyn and Staten Island Roofing Systems Reconstruction (CNYG-3109M) Completed June 2014
Greenbelt Native Plant Center Greenbelt Native Plant Center Heating System Reconstruction Completed November 2016
Greencroft Playground Staten Island General Site Work (RG-1013M) Completed December 2016
Heritage Park Heritage Park Operations Building Demolition (Hurricane Sandy) Completed October 2017
Ida Court Carlton Park Landscape and Ida Court Playground Reconstruction Completed September 2019
LaTourette Park & Golf Course New Springville Greenway Construction Completed July 2015
Lemon Creek Park Staten Island General Site Work (RG-713M) Completed March 2015
Lemon Creek Park Lemon Creek Park Timber Barrier Rail Reconstruction Completed August 2016
Levy Playground Levy Playground Reconstruction Completed May 2018
Long Pond Park Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1) Completed June 2015
Lyons Pool Citywide Electrical Systems Reconstruction (CNYG-1611MA) Completed July 2017
Lyons Pool Faber Pool and Lyons Pool Boiler Reconstruction Completed July 2018
Mahoney Playground Brooklyn and Staten Island General Roofing Systems Reconstruction (CNYG-1214MA) Completed February 2019
Mahoney Playground Mahoney Playground Rain Garden Reconstruction Completed April 2018
Midland Playground Staten Island General Site Work (RG-913M) Completed August 2015
Ocean Breeze Park Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1) Completed June 2015
Ocean Breeze Park Ocean Breeze Park Maintenance Area Fencing Construction Completed August 2019
Old Town Playground Brooklyn and Staten Island Roofing Systems Reconstruction (CNYG-3109M) Completed June 2014
Schmul Park Schmul Park and Dugan Playground Ballfield Reconstruction Completed June 2017
Seaside Wildlife Nature Park Nelson Avenue Waterfront Park Reconstruction (Hurricane Sandy) Completed March 2019
Silver Lake Park Brooklyn and Staten Island Roofing Systems Reconstruction (CNYG-3109M) Completed June 2014
Silver Lake Park Staten Island General Site Work (RG-713M) Completed March 2015
Silver Lake Park Silver Lake Park Path Reconstruction Completed February 2019
Skyline Playground Skyline Playground Tennis Courts Reconstruction Completed July 2017
Stapleton Playground Brooklyn and Staten Island Roofing Systems Reconstruction (CNYG-3109M) Completed June 2014
Staten Island Industrial Park Citywide Electrical Systems Reconstruction (CNYG-309M) Completed January 2014
The Big Park Arrochar Playground and Grandview Playground Comfort Station Reconstruction Completed February 2019
The Big Park Grandview Playground Reconstruction Completed June 2018
Tottenville Pool Citywide Pool Electrical Systems Reconstruction (CNYG-815MA) Completed June 2019
Tottenville Pool Citywide Pool Plumbing Systems Reconstruction (CNYG-915M) Completed June 2019
Tottenville Pool Citywide Pool Structural Systems Reconstruction (CNYG-1015M) Completed June 2019
Westerleigh Park Westerleigh Park Rain Garden Construction Completed September 2016
Wolfe's Pond Park Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1) Completed June 2015
Wolfe's Pond Park Staten Island General Site Work (RG-1013M) Completed December 2016
Wolfe's Pond Park Wolfe's Pond Park Landscape Reconstruction Completed October 2019
Wolfe's Pond Park Wolfe's Pond Park Playground Reconstruction (Hurricane Sandy) Completed May 2018
Staten Island Sandy-Related Tree Removal Completed September 2015
Staten Island Sandy-Related Tree Replacement Completed June 2016
Staten Island Street Tree Planting FY13 (RG-111MR) Completed June 2014
Staten Island Street Tree Planting FY14 Completed March 2015
Staten Island Street Tree Planting FY15 Completed May 2016
Staten Island Street Tree Planting FY16 Completed June 2017
Staten Island Street Tree Planting FY17 Completed June 2018