NYC Resources311Office of the Mayor

Official Website of the New York City Department of Parks & Recreation

Capital Project Tracker

Rendering of Lakeside Center

In order to invest in the care of our parks, we must regularly redesign and rebuild our city’s parks and facilities. There are more than 500 active projects taking place at any time in parks throughout the city, ranging from improvements to parks, playgrounds, and greenways, to renovations of ball fields and recreational facilities, to resiliency efforts for beaches and boardwalks. Learn more about projects taking place near you, and find out the current status of a project.

How We Build Parks

Visit our How We Build Parks page to learn more about the three main phases of the city’s capital process and how a project becomes eligible for capital funding.

 
 

View Active ProjectsView Proposed ProjectsView Partner ProjectsView Completed Projects

Completed Projects View only projects nearing completion

Bronx Projects

Park Project Phase Completion Date
Allerton Playground Bronx General Site Work (XG-114M) Completed March 2017
Allerton Playground Bronx General Site Work (XG-514M) Completed February 2017
Aqueduct Walk Aqueduct Walk 182nd Place Pathway Reconstruction Completed June 2014
Aqueduct Walk Old Croton Aqueduct Signage Installation Completed April 2017
Arcilla Playground Bronx and Queens Roofing Systems Reconstruction Completed June 2015
Bicentennial Veterans Memorial Park Bronx General Site Work (XG-112M) Completed March 2016
Bicentennial Veterans Memorial Park Bronx General Site Work (XG-315M) Completed December 2017
Bronx Park Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1) Completed June 2015
Bronx Park Bronx and Queens Roofing Systems Reconstruction Completed June 2015
Bronx Park Bronx General Site Work (XG-112M) Completed March 2016
Bronx Park Bronx Park Anadromous Fish Passage Reconstruction Completed December 2014
Bronx Park Bronx Park Brady Playground Adult Fitness Equipment Construction Completed January 2017
Bronx Park Bronx River Park Greenway Construction Completed June 2017
Bronx River Parkway Bronx and Queens Roofing Systems Reconstruction Completed June 2015
Bronx River Parkway Parque de los Ninos Playground and Seating Area Reconstruction Completed March 2017
Bufano Park Bronx General Site Work (XG-315M) Completed December 2017
Caserta Playground Bronx and Queens Roofing Systems Reconstruction Completed June 2015
Castle Hill Park Castle Hill Park Path and Site Work Construction Completed January 2016
Cedar Playground Bronx General Site Work (XG-112M) Completed March 2016
Cedar Playground Cedar Playground Basketball Court and Playground Reconstruction Completed August 2016
Claremont Park Bronx General Site Work (XG-114M) Completed March 2017
Co-op City Field Co-Op City Field Bleacher and Pathway Reconstruction Completed August 2014
Colucci Playground Bronx and Queens Roofing Systems Reconstruction Completed June 2015
Colucci Playground Colucci Park Seating Area Reconstruction Completed August 2017
Cooney Grauer Field Cooney Grauer Field Chain Link Fence Construction Completed September 2014
Crotona Park Citywide Pool Structural Systems Reconstruction (CNYG-1011M) Completed June 2017
Crotona Park Citywide Electrical Systems Reconstruction (CNYG-1611MA) Completed July 2017
Crotona Park Bronx and Queens Roofing Systems Reconstruction Completed June 2015
Crotona Park Bronx General Site Work (XG-112M) Completed March 2016
Crotona Park Bronx General Site Work (XG-410M) Completed September 2013
Crotona Park Crotona Park Tennis Building Electrical Upgrade Completed December 2014
Devoe Park Bronx General Site Work (XG-112M) Completed March 2016
Dunbar Playground Bronx General Site Work (XG-114M) Completed March 2017
Eastchester Playground Bronx General Site Work (XG-514M) Completed February 2017
Eastchester Playground Bronx and Queens Roofing Systems Reconstruction Completed June 2015
Estella Diggs Park Estella Diggs Park Reconstruction Completed May 2017
Ewen Park Ewen Park Tot Lot Construction and Basketball Court Reconstruction Completed December 2016
Ferry Point Park Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1) Completed June 2015
Ferry Point Park Ferry Point Community Park Comfort Station Construction Completed July 2015
Ferry Point Park Ferry Point Park Golf Course Construction Completed June 2014
Ferry Point Park Ferry Point Park Golf Course Parking Lot Reconstruction Completed May 2015
Ferry Point Park Ferry Point Park Reconstruction (Hurricane Sandy) Completed January 2017
Flynn Playground Bronx General Site Work (XG-112M) Completed March 2016
Franz Sigel Park Bronx General Site Work (XG-112M) Completed March 2016
Gouverneur Playground Bronx and Queens Roofing Systems Reconstruction Completed June 2015
Grand Playground Grand Avenue Playground Construction Completed June 2017
Grove Hill Playground Bronx and Queens Roofing Systems Reconstruction Completed June 2015
Haffen Park Citywide Buildings Reconstruction (CNYG-209M) Completed February 2015
Haffen Park Bronx General Site Work (XG-410M) Completed September 2013
Harris Park Citywide Electrical Systems Reconstruction (CNYG-1611MA) Completed July 2017
Harris Park Citywide Buildings Reconstruction (CNYG-209M) Completed February 2015
Harris Park Harris Park Reconstruction Completed February 2018
Henry Hudson Park Bronx and Queens Roofing Systems Reconstruction Completed June 2015
Highbridge Park Old Croton Aqueduct Signage Installation Completed April 2017
Hilton White Playground Bronx and Queens Roofing Systems Reconstruction Completed June 2015
Hutchinson River Parkway Hutchinson River Greenway Construction Completed October 2013
I-Am-Park Bronx General Site Work (XG-114M) Completed March 2017
Jerome Park Old Croton Aqueduct Signage Installation Completed April 2017
Jerome Park Jerome Park Reservoir Jogging Trail Construction Completed December 2014
Julio Carballo Fields Citywide Electrical Systems Reconstruction (CNYG-1611MA) Completed July 2017
Loreto Playground Bronx and Queens Roofing Systems Reconstruction Completed June 2015
Lozada Playground Bronx General Site Work (XG-514M) Completed February 2017
Lyons Square Park Lyons Square Playground Reconstruction Completed December 2017
Mazzei Playground Bronx General Site Work (XG-514M) Completed February 2017
Merriam Playground Bronx General Site Work (XG-410M) Completed September 2013
Morgan Playground Bronx General Site Work (XG-410M) Completed September 2013
Mosholu Parkway Bronx General Site Work (XG-114M) Completed March 2017
Mosholu Parkway Bronx General Site Work (XG-112M) Completed March 2016
Mosholu Parkway Mosholu Parkway WWI Monument Lighting System Construction Completed September 2013
Mott Playground Bronx and Queens Roofing Systems Reconstruction Completed June 2015
Mullaly Park Citywide Electrical Systems Reconstruction (CNYG-1611MA) Completed July 2017
Mullaly Park Bronx General Site Work (XG-112M) Completed March 2016
Pelham Bay Little League Bronx General Site Work (XG-112M) Completed March 2016
Pelham Bay Park Bronx General Site Work (XG-112M) Completed March 2016
Pelham Bay Park Bronx General Site Work (XG-315M) Completed December 2017
Pelham Bay Park Bronx, Manhattan and Queens Reforestation FY15 Completed October 2017
Pelham Bay Park Orchard Beach Bathhouse Fencing, Netting, and Scaffolding Emergency Installation Completed September 2013
Pelham Bay Park Pelham Bay Park Adult Fitness Equipment Installation Completed August 2017
Pelham Bay Park Pelham Bay Park Ballfields 4 & 5 Lighting Reconstruction Completed May 2017
Pelham Bay Park Pelham Bay Park Guiderail Installation Completed December 2016
Pelham Bay Park Pelham Bay Park Guiderail Installation Phase 2 Completed November 2017
Pelham Bay Park Pelham Bay Park Waterfront Development Completed September 2015
Pelham Parkway Pelham Parkway Malls Reconstruction Completed November 2017
Poe Park Bronx General Site Work (XG-112M) Completed March 2016
Pugsley Creek Park Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1) Completed June 2015
Pugsley Creek Park Pugsley Creek Park Basketball Court Construction Completed June 2016
Ranaqua Park Ranaqua Park Reconstruction Completed December 2017
Randall Playground Bronx and Queens Roofing Systems Reconstruction Completed June 2015
Riverdale Park Bronx General Site Work (XG-112M) Completed March 2016
Seabury Park Seabury Park Reconstruction Completed September 2017
Soundview Park Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1) Completed June 2015
Soundview Park Bronx General Site Work (XG-112M) Completed March 2016
Soundview Park Bronx, Manhattan and Queens Reforestation FY15 Completed October 2017
Soundview Park Bronx River Greenway Construction Completed August 2015
Soundview Park Soundview Park Comfort Station Construction Completed December 2016
Soundview Park Soundview Park Dog Run Construction Completed June 2016
Soundview Park Soundview Park Performance Lawn and Overlook Construction Completed April 2015
Soundview Park Soundview Park Playground and Court Reconstruction Completed May 2017
Soundview Park Soundview Park Running Track and Athletic Field Construction Completed June 2014
St. James Park Citywide Electrical Systems Reconstruction (CNYG-1611MA) Completed July 2017
St. James Park Bronx General Site Work (XG-114M) Completed March 2017
St. James Park Bronx and Queens Roofing Systems Reconstruction Completed June 2015
St. James Park Bronx General Site Work (XG-112M) Completed March 2016
St. Mary's Park Citywide Pool Structural Systems Reconstruction (CNYG-1011M) Completed June 2017
St. Mary's Park Bronx and Queens Roofing Systems Reconstruction Completed June 2015
Stebbins Playground Bronx General Site Work (XG-114M) Completed March 2017
University Malls Old Croton Aqueduct Signage Installation Completed April 2017
University Woods University Park Stairway Reconstruction Completed June 2014
Van Cortlandt Park Old Croton Aqueduct Signage Installation Completed April 2017
Van Cortlandt Park Bronx and Queens Roofing Systems Reconstruction Completed June 2015
Van Cortlandt Park Bronx General Site Work (XG-112M) Completed March 2016
Van Cortlandt Park Citywide Plumbing Systems Reconstruction (CNYG-1711MA1) Completed June 2016
Van Cortlandt's Tail Bronx General Site Work (XG-112M) Completed March 2016
Van Nest Park Van Nest Playground Reconstruction Completed January 2015
Vidalia Park Bronx General Site Work (XG-315M) Completed December 2017
Vinmont Veteran Park Bronx and Queens Roofing Systems Reconstruction Completed June 2015
Vinmont Veteran Park Bronx General Site Work (XG-315M) Completed December 2017
Washington's Walk Bronx General Site Work (XG-112M) Completed March 2016
Washington's Walk Bronx General Site Work (XG-410M) Completed September 2013
Williamsbridge Oval Bronx General Site Work (XG-112M) Completed March 2016
Williamsbridge Oval Bronx and Manhattan Recreation and Nature Center HVAC Repair (CNYG-1810MA) Completed July 2015
Williamsbridge Oval Citywide Electrical Systems Reconstruction (CNYG-309M) Completed January 2014
Williamsbridge Oval Williamsbridge Oval Recreation Building Reconstruction Completed November 2013
Willis Playground Bronx General Site Work (XG-514M) Completed February 2017
Willis Playground Willis Playground Comfort Station Roof Replacement Completed October 2016
Zimmerman Playground Zimmerman Playground Comfort Station Roof Replacement Completed April 2017
Bronx General Site Work (XG-514M) Completed February 2017
Bronx River Greenway Construction Completed August 2015
Amendola Plaza Reconstruction Completed April 2017
Belden Point Reconstruction Completed December 2015
Bronx Invasive Species Removal and Tree Planting FY14 Completed November 2016
Bronx Sandy-Related Tree Removal Completed July 2015
Bronx Sandy-Related Tree Replacement Completed March 2016
Bronx Street Tree Planting FY13 - Community Boards 1-8 (XG-113M) Completed February 2014
Bronx Street Tree Planting FY13 - Community Boards 9-12 (XG-213M) Completed February 2014
Bronx Street Tree Planting FY13 - Community Boards 9-12 (XG-412M) Completed August 2013
Bronx Street Tree Planting FY14 - Community Boards 1-6 Completed January 2015
Bronx Street Tree Planting FY14 - Community Boards 7-12 Completed January 2015
Bronx Street Tree Planting FY15 - Community Boards 1-8 Completed February 2016
Bronx Street Tree Planting FY15 - Community Boards 9-12 Completed April 2016
Bronx Street Tree Planting FY16 - Community Boards 1-8 Completed August 2017
Bronx Street Tree Planting FY16 - Community Boards 9-12 Completed August 2017
Crotona Parkway Green Infrastructure Construction Completed June 2015
Jackson Forest Community Garden Reconstruction Completed April 2017

Brooklyn Projects

Park Project Phase Completion Date
American Veterans Memorial Pier Bay Ridge Eco-Dock Construction Completed September 2013
Asser Levy Park Asser Levy Park Flagpole Installation Completed September 2015
Bayview Playground Linden Park Handball Court and Bayview Playground Baseball Field Reconstruction Completed June 2014
Belmont Playground Brooklyn General Site Work (BG-311M) Completed December 2014
Belt Parkway/Shore Parkway Shore Parkway Emergency Protective Measures (Hurricane Sandy) Completed November 2013
Benson Playground Benson Playground Asphalt Field and Handball Court Reconstruction Completed May 2017
Bensonhurst Park Brooklyn General Site Work (BG-711M) Completed June 2014
Betsy Head Park Betsy Head Playground Reconstruction Completed December 2015
Betsy Head Park Brooklyn and Staten Island Roofing Systems Reconstruction (CNYG-415M) Completed July 2017
Brighton Playground Brooklyn General Site Work For Hurricane Sandy (BG-1113M) Completed December 2016
Brizzi Playground Brooklyn General Site Work (BG-512M) Completed November 2014
Brower Park Brower Park Skate Park Element Installation Completed July 2016
Brownsville Playground Brooklyn and Staten Island Roofing Systems Reconstruction (CNYG-3109M) Completed June 2014
Brownsville Playground Brownsville Recreation Center Pool HVAC System Reconstruction Completed March 2014
Brownsville Playground Brownsville Recreation Center Pool Roof Reconstruction Completed June 2017
Bushwick Playground Citywide Electrical Systems Reconstruction (CNYG-907M) Completed October 2014
Bushwick Playground Citywide Plumbing Systems Reconstruction (CNYG-1007M) Completed April 2014
Bushwick Playground Bushwick Playground Pool Reconstruction Completed June 2017
Bushwick Playground Citywide Buildings Reconstruction (CNYG-209M) Completed February 2015
Calvert Vaux Park Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1) Completed June 2015
Calvert Vaux Park Calvert Vaux Park Aquatic and Coastal Upland Habitat Restoration Completed August 2013
Calvert Vaux Park Calvert Vaux Park Soccer Fields Construction Completed October 2013
Canarsie Park Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1) Completed June 2015
Canarsie Park Brooklyn and Staten Island Roofing Systems Reconstruction (CNYG-415M) Completed July 2017
Canarsie Park Canarsie Park Playground Construction Completed October 2013
Carroll Park Brooklyn General Site Work For Hurricane Sandy (BG-1113M) Completed December 2016
Carver Playground Citywide Plumbing Systems Reconstruction (CNYG-1007M) Completed April 2014
Coffey Park Brooklyn General Site Work For Hurricane Sandy (BG-1113M) Completed December 2016
Coffey Park Coffey Park Pathway and Barbecue Area Reconstruction Completed June 2015
Colonel David Marcus Playground Citywide Sandy-Related Recreational Lighting and Electrical Line Reconstruction Completed November 2013
Colonel David Marcus Playground Jackie Robinson Playground and Colonel David Marcus Southeast Playground Reconstruction Completed August 2016
Colonel David Marcus Playground Ocean Parkway Malls and Colonel David Marcus Playground Reconstruction Completed October 2014
Columbus Park Columbus Park Pavement Restoration Completed November 2016
Commodore Barry Park Commodore Barry Park Pool Reconstruction Completed June 2017
Coney Island Beach & Boardwalk Brooklyn and Staten Island Roofing Systems Reconstruction (CNYG-3109M) Completed June 2014
Coney Island Beach & Boardwalk Coney Island Beach Entrance Garden Construction at Brighton 2nd and West 33rd Sts Completed April 2015
Coney Island Beach & Boardwalk Coney Island Boardwalk Reconstruction Between Brighton 15th Street and Coney Island Avenue Completed May 2016
Cooper Park Cooper Park Dog Run Construction and Athletic Court Reconstruction Completed December 2015
Crispus Attucks Playground Crispus Attucks Playground Handball and Basketball Court Reconstruction Completed April 2017
Dean Playground Brooklyn General Site Work (BG-711M) Completed June 2014
Dimattina Playground DiMattina Park, Dyker Beach Park, and Owl's Head Park Dog Run Reconstruction Completed March 2015
Dome Playground Dome Park Playground Reconstruction Completed April 2016
Dyker Beach Park Brooklyn General Site Work (BG-512M) Completed November 2014
Dyker Beach Park DiMattina Park, Dyker Beach Park, and Owl's Head Park Dog Run Reconstruction Completed March 2015
Eleanor Roosevelt Playground Brooklyn and Staten Island Roofing Systems Reconstruction (CNYG-3109M) Completed June 2014
Fort Greene Park Fort Greene Park Willoughby Avenue Entrance Reconstruction Completed December 2015
Glenwood Playground Glenwood Playground Synthetic Multipurpose Field Construction Completed April 2017
Glenwood Playground Wingate Park & Glenwood Playground Reconstruction Completed May 2016
Gravesend Park Gravesend Park Comfort Station Construction Completed June 2017
Gravesend Park Gravesend Park Playground and Court Area Reconstruction Completed October 2016
Hamilton Metz Field Brooklyn General Site Work (BG-711M) Completed June 2014
Harry Maze Playground Harry Maze Park Security Lighting Installation Completed May 2017
Harry Maze Playground Hickman Playground and Harry Maze Playground Multipurpose Field Reconstruction Completed August 2016
Heckscher Playground Brooklyn and Staten Island Roofing Systems Reconstruction (CNYG-415M) Completed July 2017
Heckscher Playground Heckscher Playground Reconstruction Completed June 2016
Heckscher Playground Wingate Park Gym, Heckscher Park Playground, and Nautilus Playground Reconstruction Completed May 2017
Hendrick I. Lott House Lott House Landscape Reconstruction Completed May 2015
Hickman Playground Hickman Playground and Harry Maze Playground Multipurpose Field Reconstruction Completed August 2016
Jackie Robinson Playground Brooklyn and Staten Island Roofing Systems Reconstruction (CNYG-415M) Completed July 2017
Jackie Robinson Playground Jackie Robinson Playground and Colonel David Marcus Southeast Playground Reconstruction Completed August 2016
Kosciuszko Pool Citywide Pool Structural Systems Reconstruction (CNYG-1011M) Completed June 2017
Kosciuszko Pool Citywide Electrical Systems Reconstruction (CNYG-1611MA) Completed July 2017
Kosciuszko Pool Citywide Plumbing Systems Reconstruction (CNYG-1711MA1) Completed June 2016
Leif Ericson Park Leif Ericson Park Comfort Station Construction Completed December 2015
Lincoln Terrace / Arthur S. Somers Park Lincoln Terrace Park Netball Court and Seth Low Playground Athletic Court Reconstruction Completed August 2016
Lincoln Terrace / Arthur S. Somers Park Lincoln Terrace Park Tennis Courts Reconstruction Completed November 2013
Linden Park Linden Park Handball Court and Bayview Playground Baseball Field Reconstruction Completed June 2014
Linden Park Linden Park Adult Fitness Area Construction Completed October 2016
Lindower Park Lindower Park Ballfield Reconstruction Completed December 2015
Luna Park Brooklyn and Staten Island Roofing Systems Reconstruction (CNYG-3109M) Completed June 2014
Manhattan Beach Park Brooklyn General Site Work (BG-711M) Completed June 2014
Marine Park Marine Park Bike Path Restoration Completed December 2014
Marine Park Marine Park Bocce Court and Sport Court Reconstruction Completed December 2016
Marine Park Marine Park Gerritsen Avenue Pedestrian Path Construction Phase 1 Completed April 2017
Marine Park Marine Park Seba Playground Expansion Completed May 2014
Marlboro Playground Brooklyn General Site Work (BG-1007M) Completed October 2013
Marlboro Playground Marlboro Playground Lighting Installation Completed March 2017
Martin Luther King Jr. Playground Martin Luther King Park Spray Shower, Ocean Hill Playground, and Wingate Park Playground Reconstruction Completed August 2017
Martinez Playground Brooklyn General Site Work (BG-1007M) Completed October 2013
McCarren Park Brooklyn General Site Work (BG-711M) Completed June 2014
McCarren Park Citywide Sandy-Related Recreational Lighting and Electrical Line Reconstruction Completed November 2013
McCarren Park McCarren Park Pool & Bath House Reconstruction Completed June 2014
McCarren Park McCarren Park Pool Bathhouse Percent For Art Artwork Installation Completed December 2016
McGuire Fields Brooklyn General Site Work For Hurricane Sandy (BG-1113M) Completed December 2016
McKinley Park McKinley Park and Seth Low Playground Synthetic Turf Ballfield Reconstruction Completed September 2017
Metropolitan Recreation Center Citywide Pool Structural Systems Reconstruction (CNYG-1011M) Completed June 2017
Nautilus Playground Brooklyn General Site Work For Hurricane Sandy (BG-1113M) Completed December 2016
Nautilus Playground Wingate Park Gym, Heckscher Park Playground, and Nautilus Playground Reconstruction Completed May 2017
Nautilus Playground Nautilus Playground Reconstruction Completed June 2016
Ocean Hill Playground Martin Luther King Park Spray Shower, Ocean Hill Playground, and Wingate Park Playground Reconstruction Completed August 2017
Ocean Parkway Malls Brooklyn General Site Work For Hurricane Sandy (BG-1113M) Completed December 2016
Ocean Parkway Malls Ocean Parkway Malls and Colonel David Marcus Playground Reconstruction Completed October 2014
Ocean Parkway Malls Ocean Parkway Malls Reconstruction, Shore Pkwy to Sea Breeze Ave Completed May 2014
Owl's Head Park DiMattina Park, Dyker Beach Park, and Owl's Head Park Dog Run Reconstruction Completed March 2015
Owl's Head Park Owls Head Park Flagpole Installation Completed March 2016
Paerdegat Park Paerdegat Park Basketball Court Reconstruction Completed March 2015
Parade Ground Parade Ground West Comfort Station Construction Completed September 2013
Patrick O'Rourke Park Patrick O'Rourke Playground Reconstruction Completed September 2016
Pfc Norton Playground PFC Thomas Norton Comfort Station Reconstruction Completed November 2014
Pink Playground Brooklyn and Staten Island Roofing Systems Reconstruction (CNYG-3109M) Completed June 2014
Poseidon Playground Brooklyn Boiler & Heating Systems Reconstruction (BG-611M) Completed June 2014
Powell Playground Powell Park Adult Fitness Area Construction and Athletic Court Reconstruction Completed October 2016
Prospect Park Citywide Electrical Systems Reconstruction (CNYG-1611MA) Completed July 2017
Prospect Park Brooklyn and Staten Island Roofing Systems Reconstruction (CNYG-3109M) Completed June 2014
Prospect Park Brooklyn Boiler & Heating Systems Reconstruction (BG-611M) Completed June 2014
Prospect Park Litchfield Villa Telecommunications Installation Completed June 2015
Prospect Park Prospect Park Dongan Oak Path and Drainage System Reconstruction Completed October 2017
Prospect Park Prospect Park Long Meadow Ballfield 1 Reconstruction Completed October 2014
Prospect Park Prospect Park Long Meadow Dog Beach and Ballfields 6 & 7 Reconstruction Completed April 2017
Prospect Park Prospect Park Wellhouse Reconstruction Completed July 2017
Pulaski Playground Pulaski and Tilden Playground Tennis Court and Play Area Reconstruction Completed October 2013
Rappaport Playground Brooklyn General Site Work (BG-311M) Completed December 2014
Red Hook Recreation Area Citywide Pool Structural Systems Reconstruction (CNYG-1011M) Completed June 2017
Red Hook Recreation Area Citywide Electrical Systems Reconstruction (CNYG-1611MA) Completed July 2017
Red Hook Recreation Area Citywide Plumbing Systems Reconstruction (CNYG-1711MA1) Completed June 2016
Red Hook Recreation Area Red Hook Recreation Center Sandy-Related Boiler Reconstruction Completed June 2014
Saratoga Ballfields Saratoga Ballfields Reconstruction Completed July 2017
Saratoga Park Saratoga Square Park Memorial Reconstruction Completed August 2014
Seeley Park Seeley Park Reconstruction Completed December 2014
Seth Low Playground/ Bealin Square Lincoln Terrace Park Netball Court and Seth Low Playground Athletic Court Reconstruction Completed August 2016
Seth Low Playground/ Bealin Square McKinley Park and Seth Low Playground Synthetic Turf Ballfield Reconstruction Completed September 2017
Sixteen Sycamores Playground Citywide Electrical Systems Reconstruction (CNYG-907M) Completed October 2014
Sixteen Sycamores Playground Citywide Plumbing Systems Reconstruction (CNYG-1007M) Completed April 2014
Sixteen Sycamores Playground Citywide Buildings Reconstruction (CNYG-209M) Completed February 2015
Sixteen Sycamores Playground Brooklyn General Site Work (BG-1007M) Completed October 2013
South Oxford Park Brooklyn General Site Work (BG-711M) Completed June 2014
Spring Creek Park Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1) Completed June 2015
St. John's Recreation Center Citywide Pool Structural Systems Reconstruction (CNYG-1011M) Completed June 2017
St. John's Recreation Center St. John's Recreation Center Sitting Area Reconstruction Completed May 2015
Sunset Park Citywide Pool Structural Systems Reconstruction (CNYG-1011M) Completed June 2017
Sunset Park Citywide Electrical Systems Reconstruction (CNYG-1611MA) Completed July 2017
Sunset Park Brooklyn and Staten Island Roofing Systems Reconstruction (CNYG-415M) Completed July 2017
Sunset Park Citywide Plumbing Systems Reconstruction (CNYG-1711MA1) Completed June 2016
Sunset Park Sunset Park Playground Reconstruction Completed July 2017
Sunset Park Sunset Park Spray Shower Reconstruction Completed October 2014
Surf Playground Surf Playground Reconstruction Completed June 2016
Taaffe Playground Taaffe Playground Reconstruction Completed September 2016
Thomas Boyland Park Thomas Boyland Park Reconstruction Completed August 2017
Thomas Greene Playground Thomas Greene Playground Pool Reconstruction Completed June 2017
Thomas Greene Playground Thomas Greene Playground Reconstruction Completed June 2015
Tilden Playground Pulaski and Tilden Playground Tennis Court and Play Area Reconstruction Completed October 2013
Valentino Pier Brooklyn General Site Work (BG-311M) Completed December 2014
Wingate Park Wingate Park & Glenwood Playground Reconstruction Completed May 2016
Wingate Park Wingate Park Gym, Heckscher Park Playground, and Nautilus Playground Reconstruction Completed May 2017
Wingate Park Martin Luther King Park Spray Shower, Ocean Hill Playground, and Wingate Park Playground Reconstruction Completed August 2017
Queens General Site Work (QG-713MA) Completed November 2016
Brooklyn General Site Work (BG-711M) Completed June 2014
Brooklyn General Site Work (BG-1007M) Completed October 2013
Brooklyn Sandy-Related Tree Removal - Community Boards 1-6 Completed June 2015
Brooklyn Sandy-Related Tree Removal - Community Boards 7-18 Completed June 2016
Brooklyn Sandy-Related Tree Replacement Completed November 2015
Brooklyn Street Tree Planting & Invasive Species Removal FY11 Completed April 2014
Brooklyn Street Tree Planting FY10 - Community Board 2 Completed November 2013
Brooklyn Street Tree Planting FY10 (BG-810MA) Completed February 2014
Brooklyn Street Tree Planting FY11 - Community Boards 7,10-15,17,18 (BG-511MR) Completed April 2015
Brooklyn Street Tree Planting FY13 - Community Boards 1-6,8,9,16 Completed April 2014
Brooklyn Street Tree Planting FY13 - Community Boards 5,16,17,18 Completed March 2014
Brooklyn Street Tree Planting FY14 - Community Boards 1-6,8 Completed March 2015
Brooklyn Street Tree Planting FY14 - Community Boards 5,9,16,17,18 Completed March 2015
Brooklyn Street Tree Planting FY14 - Community Boards 7,10-15 Completed March 2015
Brooklyn Street Tree Planting FY15 - Community Boards 1-4 Completed April 2016
Brooklyn Street Tree Planting FY15 - Community Boards 11,13-15,18 Completed April 2016
Brooklyn Street Tree Planting FY15 - Community Boards 5,8,9,16,17 Completed July 2016
Brooklyn Street Tree Planting FY15 - Community Boards 6,7,10,12 Completed June 2016
Brooklyn Street Tree Planting FY16 - Community Boards 1-4 Completed January 2017
Brooklyn Street Tree Planting FY16 - Community Boards 11,13,14,15,18 Completed September 2017
Brooklyn Street Tree Planting FY16 - Community Boards 5,8,9,16,17 Completed January 2017
Brooklyn Street Tree Planting FY16 - Community Boards 6,7,10,12 Completed September 2017
PS 192 Playground Reconstruction Completed June 2014
PS 192 Playground Reconstruction Phase 2 Completed September 2015

Manhattan Projects

Park Project Phase Completion Date
Abraham Lincoln Playground Citywide Pool Structural Systems Reconstruction (CNYG-1011M) Completed June 2017
Alexander Hamilton Playground Manhattan Roofing Systems Reconstruction (MG-709M) Completed August 2015
Alfred E. Smith Playground Citywide Electrical Systems Reconstruction (CNYG-1611MA) Completed July 2017
Andrew Haswell Green Park Andrew Haswell Green Searail and Rooftop Sitting Area Construction Completed January 2017
Asser Levy Playground Citywide Pool Structural Systems Reconstruction (CNYG-1011M) Completed June 2017
Asser Levy Playground Citywide Electrical Systems Reconstruction (CNYG-1611MA) Completed July 2017
Asser Levy Playground Asser Levy Boiler and Pool Dehumidifier Repair Completed May 2017
Asser Levy Playground Asser Levy Playground Expansion Completed October 2014
Asser Levy Playground Manhattan General Site Work (MG-112M) Completed November 2014
Baruch Playground Manhattan General Site Work (MG-112M) Completed November 2014
Bellevue South Park Bellevue South Park Landscape Reconstruction Completed November 2013
Bleecker Playground Bleecker Playground and Comfort Station Reconstruction Completed August 2013
Carl Schurz Park Manhattan General Site Work (MG-112M) Completed November 2014
Carmansville Park Carmansville Playground Reconstruction Completed December 2017
Central Park Citywide Electrical Systems Reconstruction (CNYG-1611MA) Completed July 2017
Central Park Arsenal Emergency Elevator Reconstruction Completed September 2017
Collect Pond Park Collect Pond Park Construction Completed November 2013
Corlears Hook Park Manhattan General Site Work (MG-112M) Completed November 2014
Dante Park Manhattan General Site Work (MG-112M) Completed November 2014
De Witt Clinton Park Manhattan General Site Work (MG-213M) Completed December 2016
De Witt Clinton Park Manhattan Roofing Systems Reconstruction (MG-614M) Completed September 2017
Dr. Gertrude B. Kelly Playground Manhattan General Site Work (MG-112M) Completed November 2014
Dry Dock Playground Dry Dock Playground Reconstruction Completed December 2015
East River Playground Manhattan Roofing Systems Reconstruction (MG-709M) Completed August 2015
Fort Tryon Park Manhattan Roofing Systems Reconstruction (MG-709M) Completed August 2015
Fort Tryon Park Manhattan Roofing Systems Reconstruction (MG-614M) Completed September 2017
Fort Tryon Park Fort Tryon Park Path and Stair Reconstruction Completed April 2015
Fort Washington Park Fort Washington Park Ballfields Reconstruction Completed October 2013
Fort Washington Park Fort Washington Park Courts Reconstruction and Playground Construction Completed October 2013
Fort Washington Park Fort Washington Park Dyckman Street Ramp Construction and Inwood Hill Park Entrance Reconstruction Completed June 2015
Fort Washington Park Fort Washington Park Greenway Construction Completed June 2014
Frederick Johnson Playground Frederick Johnson Park Tennis Courts Reconstruction Completed October 2013
Gertrude Ederle Recreation Center Citywide Pool Structural Systems Reconstruction (CNYG-1011M) Completed June 2017
Gertrude Ederle Recreation Center Citywide Buildings Reconstruction (CNYG-209M) Completed February 2015
Gertrude Ederle Recreation Center Gertrude Ederle Recreation Center Playground Reconstruction Completed September 2016
Hamilton Fish Park Citywide Electrical Systems Reconstruction (CNYG-1611MA) Completed July 2017
Hamilton Fish Park Bronx and Manhattan Recreation and Nature Center HVAC Repair (CNYG-1810MA) Completed July 2015
Hansborough Recreation Center Citywide Pool Structural Systems Reconstruction (CNYG-1011M) Completed June 2017
Hansborough Recreation Center Manhattan Roofing Systems Reconstruction (MG-709M) Completed August 2015
Hansborough Recreation Center Citywide Electrical Systems Reconstruction (CNYG-1611MA) Completed July 2017
Hansborough Recreation Center Bronx and Manhattan Recreation and Nature Center HVAC Repair (CNYG-1810MA) Completed July 2015
Hansborough Recreation Center Hansborough Recreation Center Gym Floor and Window Reconstruction Completed November 2017
Harlem Lane Playground Manhattan General Site Work (MG-112M) Completed November 2014
Hell's Kitchen Park Manhattan General Site Work (MG-213M) Completed December 2016
Henry M. Jackson Playground Henry M. Jackson Playground Reconstruction Completed June 2017
Highbridge Park Citywide Pool Structural Systems Reconstruction (CNYG-1011M) Completed June 2017
Highbridge Park Citywide Electrical Systems Reconstruction (CNYG-1611MA) Completed July 2017
Highbridge Park Citywide Buildings Reconstruction (CNYG-209M) Completed February 2015
Highbridge Park Citywide Plumbing Systems Reconstruction (CNYG-1711MA1) Completed June 2016
Highbridge Park Highbridge Park Brush Stairway Reconstruction Completed February 2014
Howard Bennett Playground Manhattan Roofing Systems Reconstruction (MG-709M) Completed August 2015
Inwood Hill Park Citywide Plumbing Systems Reconstruction (CNYG-1007M) Completed April 2014
Inwood Hill Park Citywide Buildings Reconstruction (CNYG-209M) Completed February 2015
Inwood Hill Park Fort Washington Park Dyckman Street Ramp Construction and Inwood Hill Park Entrance Reconstruction Completed June 2015
Inwood Hill Park Inwood Hill Park Little League Baseball Field Reconstruction Completed May 2014
Isham Park Isham Park Water System Reconstruction Completed April 2015
J. Hood Wright Park J. Hood Wright Park Recreation Center HVAC Reconstruction Completed June 2014
Jackie Robinson Park Citywide Pool Structural Systems Reconstruction (CNYG-1011M) Completed June 2017
Jackie Robinson Park Citywide Electrical Systems Reconstruction (CNYG-1611MA) Completed July 2017
James J Walker Park James J. Walker Park Synthetic Turf Ballfield Construction Completed August 2013
James Madison Plaza James Madison Plaza Reconstruction Completed October 2013
John Jay Park Manhattan General Site Work (MG-112M) Completed November 2014
John Jay Park Tony Dapolito Recreation Center and John Jay Pool Sandy-Related Boiler Repair Completed February 2015
John V. Lindsay East River Park Citywide Electrical Systems Reconstruction (CNYG-907M) Completed October 2014
John V. Lindsay East River Park Manhattan General Site Work (MG-112M) Completed November 2014
John V. Lindsay East River Park Manhattan Roofing Systems Reconstruction (MG-614M) Completed September 2017
Marcus Garvey Park Citywide Pool Structural Systems Reconstruction (CNYG-1011M) Completed June 2017
Marcus Garvey Park Marcus Garvey Park Fire Watchtower Dismantling Completed June 2015
Martin Luther King Jr. Park Manhattan Roofing Systems Reconstruction (MG-614M) Completed September 2017
Martin Luther King Jr. Park Martin Luther King Jr. Playground Reconstruction Completed January 2018
Matthews - Palmer Playground Manhattan Roofing Systems Reconstruction (MG-614M) Completed September 2017
McCaffrey Playground Manhattan Roofing Systems Reconstruction (MG-614M) Completed September 2017
Morningside Park Manhattan Roofing Systems Reconstruction (MG-709M) Completed August 2015
Morningside Park Manhattan General Site Work (MG-112M) Completed November 2014
Morningside Park Morningside Park 123rd Street Playground Reconstruction Phase I Completed July 2013
Murphy's Brother's Playground Manhattan General Site Work (MG-112M) Completed November 2014
Playground Eighty Nine LXXXIX Playground Eighty Nine Reconstruction Completed January 2016
Ramon Aponte Park Ramon Aponte Park Reconstruction Completed June 2016
Recreation Center 54 Citywide Pool Structural Systems Reconstruction (CNYG-1011M) Completed June 2017
Recreation Center 54 Manhattan Roofing Systems Reconstruction (MG-709M) Completed August 2015
Richard Tucker Park Manhattan General Site Work (MG-112M) Completed November 2014
Riverside Park Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1) Completed June 2015
Riverside Park Manhattan Roofing Systems Reconstruction (MG-614M) Completed September 2017
Riverside Park 79th Street Boat Basin Dock A Reconstruction Completed June 2016
Riverside Park Riverside Park Fence and Pavement Reconstruction Completed December 2015
Riverside Park Riverside Park Stairs and Sidewalk Reconstruction at Tiemann Place Completed June 2015
Riverside Park Riverside Park West 91st-96th Streets Sidewalk Reconstruction Completed October 2017
Robert L. Clinkscales Playground and Community Garden Robert Clinkscales Playground and Community Garden Reconstruction Completed May 2014
Roger Morris Park Morris-Jumel Mansion Streetscape Reconstruction Completed February 2016
Samuel N. Bennerson 2nd Playground Bennerson Playground Reconstruction Completed January 2018
Sara D. Roosevelt Park Citywide Electrical Systems Reconstruction (CNYG-907M) Completed October 2014
Septuagesimo UNO Manhattan General Site Work (MG-213M) Completed December 2016
Seward Park Manhattan Roofing Systems Reconstruction (MG-614M) Completed September 2017
Sheltering Arms Playground Citywide Plumbing Systems Reconstruction (CNYG-1711MA1) Completed June 2016
Sherman Creek Manhattan General Site Work (MG-112M) Completed November 2014
Sherman Creek Sherman Creek Entrance, Path, and Fencing Construction Completed May 2014
Sol Lain Plgd Sol Lain Playground Reconstruction Completed September 2017
Stanley Isaacs Playground Manhattan General Site Work (MG-112M) Completed November 2014
Stuyvesant Square Manhattan General Site Work (MG-112M) Completed November 2014
Stuyvesant Square Stuyvesant Square Park East Section Fence and Sidewalk Reconstruction Completed December 2016
The Battery Manhattan General Site Work (MG-112M) Completed November 2014
The Battery Battery Park Comfort Station Reconstruction Completed September 2014
The Battery Battery Town Green and Battery Bikeway Construction Completed October 2015
Theodore Roosevelt Park Manhattan General Site Work (MG-112M) Completed November 2014
Theodore Roosevelt Park Theodore Roosevelt Park Pavement Reconstruction Completed October 2014
Thomas Jefferson Park Manhattan Roofing Systems Reconstruction (MG-709M) Completed August 2015
Thomas Jefferson Park Citywide Electrical Systems Reconstruction (CNYG-1611MA) Completed July 2017
Thomas Jefferson Park Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1) Completed June 2015
Thomas Jefferson Park Thomas Jefferson Park East Harlem Skate Park Construction Completed September 2017
Thomas Paine Park Manhattan General Site Work (MG-112M) Completed November 2014
Tony Dapolito Recreation Center Citywide Electrical Systems Reconstruction (CNYG-1611MA) Completed July 2017
Tony Dapolito Recreation Center Bronx and Manhattan Recreation and Nature Center HVAC Repair (CNYG-1810MA) Completed July 2015
Tony Dapolito Recreation Center Tony Dapolito Recreation Center and John Jay Pool Sandy-Related Boiler Repair Completed February 2015
Trygve Lie Plaza Trygve Lie Plaza Sitting Area Reconstruction Completed June 2016
Wagner Houses Pool Citywide Pool Structural Systems Reconstruction (CNYG-1011M) Completed June 2017
Wards Island Park Randall's Island Hell Gate Pathway Construction Completed August 2016
Washington Square Park Washington Square Park Perimeter Sidewalk Reconstruction Completed October 2016
White Park White Playground Reconstruction Completed June 2016
Wright Brothers Playground Manhattan Roofing Systems Reconstruction (MG-709M) Completed August 2015
Manhattan General Site Work (MG-213M) Completed December 2016
Manhattan Sandy-Related Tree Removal Completed June 2016
Manhattan Sandy-Related Tree Replacement Completed December 2015
Manhattan Street Tree Planting FY13 Completed January 2014
Manhattan Street Tree Planting FY14 Completed February 2015
Manhattan Street Tree Planting FY15 Completed March 2016
Manhattan Street Tree Planting FY16 Completed June 2017
Second Avenue Subway Street Tree Planting Restitution for Removed Trees Completed June 2016

Queens Projects

Park Project Phase Completion Date
Admiral Park Queens General Site Work (QG-112M) Completed October 2014
Alley Athletic Playground Queens General Site Work (QG-613M) Completed November 2016
Alley Athletic Playground Queens General Site Work (QG-711M) Completed August 2013
Alley Pond Park Queens General Site Work (QG-112M) Completed October 2014
Alley Pond Park Alley Pond Park Paths and Drainage Reconstruction Completed August 2015
Alley Pond Park Citywide Electrical Systems Reconstruction (CNYG-907M) Completed October 2014
Alley Pond Park Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1) Completed June 2015
Alley Pond Park Citywide Plumbing Systems Reconstruction (CNYG-1007M) Completed April 2014
Alley Pond Park Queens General Site Work (QG-713MA) Completed November 2016
Almeda Playground Queens General Site Work (QG-112M) Completed October 2014
Andrews Grove Queens General Site Work (QG-112M) Completed October 2014
Annadale Playground Queens General Site Work (QG-1011M) Completed July 2014
Arverne Playground Queens General Site Work (QG-112M) Completed October 2014
Astoria Heights Park Queens General Site Work (QG-1011M) Completed July 2014
Astoria Park Citywide Pool Structural Systems Reconstruction (CNYG-1011M) Completed June 2017
Astoria Park Citywide Electrical Systems Reconstruction (CNYG-1611MA) Completed July 2017
Astoria Park Queens East River and North Shore Greenway Construction Completed September 2013
Athens Square Athens Square Playground Plaza Reconstruction Completed August 2014
Baisley Pond Park Queens General Site Work (QG-112M) Completed October 2014
Baisley Pond Park Baisley Pond Park Pathway Reconstruction Completed May 2016
Bayside Playground Queens General Site Work (QG-112M) Completed October 2014
Bayswater Park Queens General Site Work (QG-112M) Completed October 2014
Beach 30th Street Playground Queens General Site Work (QG-112M) Completed October 2014
Beach 59th St Playground Queens General Site Work (QG-112M) Completed October 2014
Beach 9 Playground Queens General Site Work (QG-112M) Completed October 2014
Beach Channel Playground Beach Channel (P.S. 183) Playground Reconstruction Completed March 2014
Bowne Park Queens General Site Work (QG-112M) Completed October 2014
Bowne Park Bowne Park Bocce Court Construction Completed August 2013
Bowne Park Bowne Park Reconstruction Completed August 2017
Brant Point Wildlife Sanctuary Queens General Site Work (QG-112M) Completed October 2014
Broad Channel Park Queens General Site Work (QG-112M) Completed October 2014
Brookville Park Queens General Site Work (QG-112M) Completed October 2014
Brookville Park Queens General Site Work (QG-613M) Completed November 2016
Cambria Playground Queens General Site Work (QG-415M) Completed March 2017
Captain Tilly Park Queens General Site Work (QG-112M) Completed October 2014
Captain Tilly Park Captain Tilly Park Landscape and Drainage Reconstruction Completed November 2015
Captain Tilly Park Captain Tilly Park Plaza Reconstruction Completed October 2017
Colden Playground Queens General Site Work (QG-112M) Completed October 2014
College Point Park Queens General Site Work (QG-1813M) Completed January 2016
Conch Playground Queens General Site Work (QG-112M) Completed October 2014
Conch Playground Conch Playground Reconstruction Completed January 2018
Corona Golf Playground Junction and Corona Golf Playground Play Equipment Installation (QG-615M) Completed April 2017
Crocheron Park Queens General Site Work (QG-112M) Completed October 2014
Crocheron Park Junction and Corona Golf Playground Play Equipment Installation (QG-615M) Completed April 2017
Cunningham Park Queens General Site Work (QG-112M) Completed October 2014
Cunningham Park Queens General Site Work (QG-711M) Completed August 2013
Cunningham Park Cunningham Park Ballfields 2-4 Reconstruction Completed July 2013
Detective Keith L Williams Park Queens General Site Work (QG-513M) Completed February 2016
Douglaston Park Golf Course Douglaston Golf Course Net Barrier Installation Completed July 2014
Dubos Point Wildlife Sanctuary Queens General Site Work (QG-112M) Completed October 2014
Dunningham Triangle Queens General Site Work (QG-1713MA) Completed June 2016
Dutch Kills Playground Bronx and Queens Roofing Systems Reconstruction Completed June 2015
Ehrenreich-Austin Playground Austin, Giovanelli, and Utopia Playgrounds Reconstruction Completed December 2017
Elmhurst Park Queens General Site Work (QG-613M) Completed November 2016
Evergreen Park Bronx and Queens Roofing Systems Reconstruction Completed June 2015
Evergreen Park Evergreen Park Playground and Spray Shower Reconstruction Completed June 2016
Flushing Fields Queens General Site Work (QG-112M) Completed October 2014
Flushing Fields Bronx and Queens Roofing Systems Reconstruction Completed June 2015
Flushing Fields Memorial Field of Flushing Ballfield Reconstruction Completed October 2013
Flushing Meadows Corona Park Queens General Site Work (QG-112M) Completed October 2014
Flushing Meadows Corona Park Citywide Electrical Systems Reconstruction (CNYG-1611MA) Completed July 2017
Flushing Meadows Corona Park Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1) Completed June 2015
Flushing Meadows Corona Park Queens General Site Work (QG-1011M) Completed July 2014
Flushing Meadows Corona Park Bronx and Queens Roofing Systems Reconstruction Completed June 2015
Flushing Meadows Corona Park Citywide Buildings Reconstruction (CNYG-209M) Completed February 2015
Flushing Meadows Corona Park Citywide Plumbing Systems Reconstruction (CNYG-1711MA1) Completed June 2016
Flushing Meadows Corona Park Flushing Meadows Corona Park Fields 2,3,5 Reconstruction Completed July 2013
Flushing Meadows Corona Park Flushing Meadows Corona Park Meadow Lake Habitat Restoration Completed May 2016
Flushing Meadows Corona Park Flushing Meadows Corona Park Pavement and Fence Reconstruction Completed September 2013
Flushing Meadows Corona Park Flushing Meadows Corona Park Pool Emergency Roof Reconstruction Completed October 2017
Flushing Meadows Corona Park Flushing Meadows Corona Park Pool Locker Room Reconstruction Completed October 2017
Flushing Meadows Corona Park Flushing Meadows Corona Park Synthetic Turf Field 1 Reconstruction Completed July 2015
Flushing Meadows Corona Park Queens General Site Work (QG-212M) Completed October 2016
Forest Park Queens General Site Work (QG-112M) Completed October 2014
Forest Park Citywide Electrical Systems Reconstruction (CNYG-1611MA) Completed July 2017
Forest Park Queens General Site Work (QG-613M) Completed November 2016
Forest Park Bronx and Queens Roofing Systems Reconstruction Completed June 2015
Forest Park Austin, Giovanelli, and Utopia Playgrounds Reconstruction Completed December 2017
Forest Park Forest Park T-Ball Field and The Overlook Drainage System Reconstruction Completed June 2016
Forest Park Joe Devoy Playground Reconstruction Completed January 2017
Forest Park Mary Whalen Playground Reconstruction Completed May 2016
Forest Park Oakridge Turn/Forest Park Drive Reconstruction Completed September 2017
Forest Park Queens General Site Work (QG-915M) Completed November 2016
Fort Totten Park Citywide Electrical Systems Reconstruction (CNYG-907M) Completed October 2014
Fort Totten Park Citywide Plumbing Systems Reconstruction (CNYG-1007M) Completed April 2014
Fort Totten Park Queens General Site Work (QG-713MA) Completed November 2016
Fort Totten Park Junction and Corona Golf Playground Play Equipment Installation (QG-615M) Completed April 2017
Fort Totten Park Queens General Site Work (QG-915M) Completed November 2016
Fort Totten Park Bronx, Manhattan and Queens Reforestation FY15 Completed October 2017
Fort Totten Park Fort Totten Building 429 Roof Replacement Completed February 2017
Fort Totten Park Fort Totten Park Seawall Reconstruction Completed August 2014
Frederick B. Judge Playground Judge Playground Basketball Courts Reconstruction Completed May 2016
Freedom Square Playground Queens General Site Work (QG-1011M) Completed July 2014
Frontera Park Queens General Site Work (QG-413M) Completed July 2017
Grassmere Playground Grassmere Playground Reconstruction Completed November 2017
Hallets Cove Playground Queens East River and North Shore Greenway Construction Completed September 2013
Hammel Playground Queens General Site Work (QG-112M) Completed October 2014
Hammel Playground Citywide Electrical Systems Reconstruction (CNYG-907M) Completed October 2014
Hammel Playground Citywide Plumbing Systems Reconstruction (CNYG-1007M) Completed April 2014
Hammel Playground Citywide Buildings Reconstruction (CNYG-209M) Completed February 2015
Hempstead Bench Spread Queens General Site Work (QG-811M) Completed September 2013
Highland Park Queens General Site Work (QG-112M) Completed October 2014
Highland Park Queens General Site Work (QG-613M) Completed November 2016
Highland Park Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1) Completed June 2015
Highland Park Highland Park Ballfields 1 & 2 Reconstruction Completed May 2016
Highland Park Highland Park Perimeter Pathways, Fencing and Security Lighting Reconstruction Completed September 2013
Highland Park Queens General Site Work (QG-913M) Completed July 2015
Hinton Park Queens General Site Work (QG-112M) Completed October 2014
Hinton Park Hinton Park Reconstruction Completed July 2016
Hoffman Park Bronx and Queens Roofing Systems Reconstruction Completed June 2015
Holy Cow Playground Queens General Site Work (QG-913M) Completed July 2015
Howard Von Dohlen Playground Von Dohlen Playground Adult Fitness and Skate Area Construction and Ballfield Reconstruction Completed April 2016
Hoyt Playground Queens General Site Work (QG-514MA) Completed April 2017
John Adams Playground Queens General Site Work (QG-112M) Completed October 2014
Judge Moses Weinstein Playground Queens General Site Work (QG-713MA) Completed November 2016
Judge Moses Weinstein Playground Bronx and Queens Roofing Systems Reconstruction Completed June 2015
Junction Playground Junction and Corona Golf Playground Play Equipment Installation (QG-615M) Completed April 2017
Juniper Valley Park Queens General Site Work (QG-112M) Completed October 2014
Juniper Valley Park Juniper Valley Park Bocce Court Construction Completed September 2014
Kissena Park Queens General Site Work (QG-112M) Completed October 2014
Kissena Park Queens General Site Work (QG-811M) Completed September 2013
L/CPL Thomas P. Noonan Jr. Playground Queens General Site Work (QG-513M) Completed February 2016
L/CPL Thomas P. Noonan Jr. Playground Noonan Playground Spray Shower and Playground Reconstruction Completed March 2015
Lannett Playground PS 197 Playground Reconstruction and Comfort Station Construction Completed April 2014
Laurelton Parkway Laurelton West Playground Reconstruction Completed June 2014
Lawrence Virgilio Playground Queens General Site Work (QG-413M) Completed July 2017
Little Bay Park Little Bay Park Soccer Field Reconstruction Completed May 2017
Little Bay Park Little Bay Parking Lot Reconstruction and Comfort Station Construction Completed January 2016
Locust Grove Civic Triangle Queens General Site Work (QG-811M) Completed September 2013
Lost Battalion Hall Recreation Center Citywide Electrical Systems Reconstruction (CNYG-1611MA) Completed July 2017
Lost Battalion Hall Recreation Center Bronx and Queens Roofing Systems Reconstruction Completed June 2015
Louis Armstrong Community Center Citywide Electrical Systems Reconstruction (CNYG-1611MA) Completed July 2017
Louis Armstrong Community Center Louis Armstrong Center HVAC Center Reconstruction Completed August 2013
Louis Armstrong Playground Citywide Plumbing Systems Reconstruction (CNYG-1007M) Completed April 2014
Macneil Park Queens General Site Work (QG-112M) Completed October 2014
Macneil Park Queens General Site Work (QG-513M) Completed February 2016
Macneil Park Queens General Site Work (QG-915M) Completed November 2016
Macneil Park Queens General Site Work (QG-811M) Completed September 2013
Marconi Park Marconi Park Playground Reconstruction Completed June 2016
Margaret I. Carman Green - Weeping Beech Bowne House Restoration Completed November 2014
Montbellier Park Queens General Site Work (QG-112M) Completed October 2014
Murray Playground Murray Playground Dog Run and Sitting Area Reconstruction Completed June 2014
Nassau Mall South Queens General Site Work (QG-112M) Completed October 2014
Neponsit Mall Queens General Site Work (QG-112M) Completed October 2014
Park at Beach 108 Street Beach 108 - Beach Channel Drive Sidewalk Reconstruction Completed April 2017
Pat Williams Playground Queens General Site Work (QG-614MA) Completed May 2017
Paul Raimonda Playground Raimonda Playground Reconstruction Completed May 2016
Phil "Scooter" Rizzuto Park Queens General Site Work (QG-112M) Completed October 2014
Plaut Triangle Queens General Site Work (QG-1813M) Completed January 2016
Playground Ninety Queens General Site Work (QG-1713MA) Completed June 2016
Police Officer Nicholas Demutiis Park Queens General Site Work (QG-713MA) Completed November 2016
Police Officer Nicholas Demutiis Park Demutiis Park Playground Reconstruction Completed August 2017
Queens Village Veterans Plaza Queens General Site Work (QG-1011M) Completed July 2014
Queensbridge Park Queens East River and North Shore Greenway Construction Completed September 2013
Rainey Park Bronx and Queens Roofing Systems Reconstruction Completed June 2015
Rainey Park Queens East River and North Shore Greenway Construction Completed September 2013
Ralph Demarco Park Queens East River and North Shore Greenway Construction Completed September 2013
Redfern Playground Queens General Site Work (QG-112M) Completed October 2014
Reiff Playground Queens General Site Work (QG-1011M) Completed July 2014
Rochdale Park Bronx and Queens Roofing Systems Reconstruction Completed June 2015
Rockaway Beach Rockaway Beach Lifeguard Trailer Furnishing and Installation Completed June 2017
Rockaway Beach Boardwalk Queens General Site Work (QG-112M) Completed October 2014
Rockaway Beach Boardwalk Queens General Site Work (QG-711M) Completed August 2013
Rockaway Beach and Boardwalk Queens General Site Work (QG-112M) Completed October 2014
Rockaway Beach and Boardwalk Rockaway Beach Emergency Protective Measures (Hurricane Sandy) Completed November 2013
Rockaway Community Park Queens General Site Work (QG-112M) Completed October 2014
Rockaway Community Park Queens General Site Work (QG-915M) Completed November 2016
Rockaway Freeway Queens General Site Work (QG-112M) Completed October 2014
Rockaway Freeway Queens General Site Work (QG-915M) Completed November 2016
Roy Wilkins Recreation Center Queens General Site Work (QG-112M) Completed October 2014
Roy Wilkins Recreation Center Queens General Site Work (QG-711M) Completed August 2013
Roy Wilkins Recreation Center Queens General Site Work (QG-212M) Completed October 2016
Roy Wilkins Recreation Center Queens General Site Work (QG-614MA) Completed May 2017
Rufus King Park Queens General Site Work (QG-613M) Completed November 2016
Rufus King Park Rufus King Park Gazebo Reconstruction Completed November 2016
Ruoff Triangle Ruoff Triangle Reconstruction Completed September 2017
Sean's Place Sean's Place Reconstruction Completed September 2017
Seaside Playground Queens General Site Work (QG-112M) Completed October 2014
Simeone Park Louis Simeone Park Reconstruction Completed January 2018
South Rochdale Playground Queens General Site Work (QG-112M) Completed October 2014
South Rochdale Playground Queens General Site Work (QG-811M) Completed September 2013
Springfield Park Queens General Site Work (QG-112M) Completed October 2014
St. Albans Park Queens General Site Work (QG-614MA) Completed May 2017
Sunrise Playground Queens General Site Work (QG-112M) Completed October 2014
Travers Park Queens General Site Work (QG-112M) Completed October 2014
Tribute Park Queens General Site Work (QG-112M) Completed October 2014
Utopia Playground Austin, Giovanelli, and Utopia Playgrounds Reconstruction Completed December 2017
Van Alst Playground Van Alst Playground Reconstruction Completed June 2017
Veterans Grove Veterans Grove Reconstruction (Q013-113M) Completed February 2017
Walter Ward Playground Queens General Site Work (QG-415M) Completed March 2017
Wayanda Park Queens General Site Work (QG-112M) Completed October 2014
Whitestone Playground Queens General Site Work (QG-1011M) Completed July 2014
Whitey Ford Field Queens General Site Work (QG-112M) Completed October 2014
Winfield Plaza Queens General Site Work (QG-1011M) Completed July 2014
Yellowstone Park Queens General Site Work (QG-212M) Completed October 2016
Queens General Site Work (QG-112M) Completed October 2014
Queens General Site Work (QG-415M) Completed March 2017
Queens General Site Work (QG-513M) Completed February 2016
Queens General Site Work (QG-514MA) Completed April 2017
44th Drive Pier Reconstruction Completed August 2016
Flushing Meadows Corona Park Street Tree Planting Restitution for USTA Construction Completed July 2015
Goodwill Park Common Green Plaza Construction Completed December 2013
Greenstreets Stormwater Capture Phase 2 Completed September 2016
PS 38 Playground Reconstruction Completed January 2014
Queens Sandy-Related Tree Removal - Community Boards 1-5 Completed August 2015
Queens Sandy-Related Tree Removal - Community Boards 6-14 Completed July 2015
Queens Sandy-Related Tree Replacement Completed March 2016
Queens Street Tree Planting FY13 - Community Boards 1-8 Completed March 2014
Queens Street Tree Planting FY13 - Community Boards 10,12-14 Completed August 2014
Queens Street Tree Planting FY13 - Community Boards 7-9,11 (QG-113M) Completed March 2014
Queens Street Tree Planting FY14 - Community Boards 1-6 Completed March 2015
Queens Street Tree Planting FY14 - Community Boards 10,12-14 Completed February 2015
Queens Street Tree Planting FY14 - Community Boards 7-9,11 Completed May 2015
Queens Street Tree Planting FY15 - Community Boards 1-6 Completed April 2016
Queens Street Tree Planting FY15 - Community Boards 7,8,11,12 Completed April 2016
Queens Street Tree Planting FY15 - Community Boards 9,10,13,14 Completed October 2016
Queens Street Tree Planting FY16 - Community Boards 1-6 Completed May 2017
Queens Street Tree Planting FY16 - Community Boards 7,8,11,12 Completed May 2017
Queens Street Tree Planting FY16 - Community Boards 9,10,13,14 Completed April 2017

Staten Island Projects

Park Project Phase Completion Date
Alice Austen Park Alice Austen Park Buono Beach Paths and Rails Reconstruction Completed July 2016
Alice Austen Park Alice Austen Park McFarlane-Bredt House Reconstruction Completed December 2013
Alice Austen Park Staten Island Clean-Up and Safe-Up of Beaches and Parks (Hurricane Sandy) Completed July 2013
Arrochar Playground Arrochar Playground Pavement Reconstruction Completed November 2015
Arrochar Playground Arrochar Playground Reconstruction Completed December 2017
Blood Root Valley Citywide Sandy-Related Recreational Lighting and Electrical Line Reconstruction Completed November 2013
CPL. Thompson Park Brooklyn and Staten Island Roofing Systems Reconstruction (CNYG-3109M) Completed June 2014
CPL. Thompson Park Staten Island General Site Work (RG-1013M) Completed December 2016
Christopher J. Igneri Playground Staten Island General Site Work (RG-214MA) Completed September 2017
Clove Lakes Park Citywide Electrical Systems Reconstruction (CNYG-1611MA) Completed July 2017
Clove Lakes Park Brooklyn and Staten Island Roofing Systems Reconstruction (CNYG-415M) Completed July 2017
Clove Lakes Park Staten Island General Site Work (RG-913M) Completed August 2015
Clove Lakes Park Stonehenge Boiler and Heating Systems Reconstruction Completed June 2014
Conference House Park Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1) Completed June 2015
Conference House Park Conference House Beach Temporary Berm Reconstruction Completed August 2016
Conference House Park Conference House Park Beaches Emergency Protective Measures (Hurricane Sandy) Completed February 2015
Conference House Park Conference House Park Lenape Playground Reconstruction Completed December 2016
Conference House Park Conference House Park Timber Barrier Rail Reconstruction Completed December 2016
Conference House Park Conference House Park Visitor Center Restroom Accessibility Reconstruction Completed November 2017
Conference House Park Staten Island Building Demolition (Hurricane Sandy) Completed March 2016
Conference House Park Staten Island General Site Work (RG-713M) Completed March 2015
Conference House Park Staten Island South Emergency Protective Measures (Hurricane Sandy) Completed December 2013
Crescent Beach Park Staten Island South Emergency Protective Measures (Hurricane Sandy) Completed December 2013
Crescent Beach Park Crescent Beach Park Barrier Berm Reconstruction Completed October 2016
De Matti Park Brooklyn and Staten Island Roofing Systems Reconstruction (CNYG-3109M) Completed June 2014
Dugan Playground Staten Island General Site Work (RG-1013M) Completed December 2016
Dugan Playground Schmul Park and Dugan Park Ball Field Construction Completed June 2017
Faber Pool and Park Brooklyn and Staten Island Roofing Systems Reconstruction (CNYG-3109M) Completed June 2014
Faber Pool and Park Citywide Plumbing Systems Reconstruction (CNYG-1711MA1) Completed June 2016
Faber Pool and Park Faber Park Safety Surfacing Reconstruction Completed May 2015
Faber Pool and Park Faber Park Skate Park Construction Completed January 2015
Franklin D. Roosevelt Boardwalk and Beach Staten Island Clean-Up and Safe-Up of Beaches and Parks (Hurricane Sandy) Completed July 2013
Franklin D. Roosevelt Boardwalk and Beach Brooklyn and Staten Island Roofing Systems Reconstruction (CNYG-3109M) Completed June 2014
Franklin D. Roosevelt Boardwalk and Beach Staten Island General Site Work (RG-913M) Completed August 2015
Franklin D. Roosevelt Boardwalk and Beach Staten Island General Site Work (RG-713M) Completed March 2015
Franklin D. Roosevelt Boardwalk and Beach Freedom Circle/Midland Beach Temporary Berm Reconstruction Completed October 2016
Franklin D. Roosevelt Boardwalk and Beach Midland Beach and Oakwood Beach Emergency Berm Installation Completed April 2014
Franklin D. Roosevelt Boardwalk and Beach Midland Beach Recreation Building Construction Completed October 2013
Franklin D. Roosevelt Boardwalk and Beach South Beach Playland Playground Curbs and Fencing Reconstruction Completed May 2015
Franklin D. Roosevelt Boardwalk and Beach Staten Island Emergency Protective Measures (Hurricane Sandy) Completed December 2013
Freshkills Park Staten Island Building Demolition (Hurricane Sandy) Completed March 2016
Freshkills Park Fresh Kills Park Owl Hollow Fields Reconstruction Completed November 2016
Freshkills Park Fresh Kills Park Zink House Roof Replacement Completed September 2017
Freshkills Park New Springville Greenway Construction Completed July 2015
Freshkills Park Owl Hollow Fields Construction Completed July 2013
Graniteville Quarry Park Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1) Completed June 2015
Great Kills Park Staten Island Clean-Up and Safe-Up of Beaches and Parks (Hurricane Sandy) Completed July 2013
Great Kills Park Staten Island Building Demolition (Hurricane Sandy) Completed March 2016
Great Kills Park Staten Island General Site Work (RG-713M) Completed March 2015
Great Kills Park Midland Beach and Oakwood Beach Emergency Berm Installation Completed April 2014
Great Kills Park Staten Island Emergency Protective Measures (Hurricane Sandy) Completed December 2013
Great Kills Park Cedar Grove Beach Access Improvements Completed May 2015
Great Kills Park Cedar Grove Beach Freshwater Wetlands Reconstruction and Planting Completed January 2017
Great Kills Park New Dorp Beach Temporary Berm Reconstruction Completed June 2016
Greenbelt Native Plant Center Brooklyn and Staten Island Roofing Systems Reconstruction (CNYG-3109M) Completed June 2014
Greenbelt Native Plant Center Greenbelt Native Plant Center Heating System Reconstruction Completed November 2016
Greencroft Playground Staten Island General Site Work (RG-1013M) Completed December 2016
Heritage Park Heritage Park Operations Building Demolition (Hurricane Sandy) Completed October 2017
LaTourette Park & Golf Course New Springville Greenway Construction Completed July 2015
Lemon Creek Park Staten Island General Site Work (RG-713M) Completed March 2015
Lemon Creek Park Lemon Creek Park Timber Barrier Rail Reconstruction Completed August 2016
Long Pond Park Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1) Completed June 2015
Lyons Pool Citywide Electrical Systems Reconstruction (CNYG-1611MA) Completed July 2017
Midland Playground Staten Island General Site Work (RG-913M) Completed August 2015
Ocean Breeze Park Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1) Completed June 2015
Old Town Playground Brooklyn and Staten Island Roofing Systems Reconstruction (CNYG-3109M) Completed June 2014
Schmul Park Schmul Park and Dugan Park Ball Field Construction Completed June 2017
Silver Lake Park Brooklyn and Staten Island Roofing Systems Reconstruction (CNYG-3109M) Completed June 2014
Silver Lake Park Staten Island General Site Work (RG-713M) Completed March 2015
Stapleton Playground Brooklyn and Staten Island Roofing Systems Reconstruction (CNYG-3109M) Completed June 2014
Staten Island Industrial Park Citywide Electrical Systems Reconstruction (CNYG-309M) Completed January 2014
Westerleigh Park Westerleigh Park Rain Garden Construction Completed September 2016
Wolfe's Pond Park Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1) Completed June 2015
Wolfe's Pond Park Staten Island General Site Work (RG-1013M) Completed December 2016
Staten Island Sandy-Related Tree Removal Completed September 2015
Staten Island Sandy-Related Tree Replacement Completed June 2016
Staten Island Street Tree Planting FY13 (RG-111MR) Completed June 2014
Staten Island Street Tree Planting FY14 Completed March 2015
Staten Island Street Tree Planting FY15 Completed May 2016
Staten Island Street Tree Planting FY16 Completed June 2017

Was this information helpful?