Press Releases

FOR IMMEDIATE RELEASE
Friday, September 18, 2020
No. 38
www.nyc.gov/parks

NYC PARKS TO TEMPORARILY CLOSE RIVERSIDE PARK CHERRY WALK—MANHATTAN

Planned reconstruction of path requires greenway detour

Out of an abundance of caution, and due to planned shoreline and path reconstruction work, NYC Parks has announced that it will temporarily close the Cherry Walk path in Riverside Park from W. 100th to W. 125th streets. The closure will begin Monday, September 28.

To accommodate pedestrians and cyclists, Parks will post signs at related path entrances, south and north of the greenway, notifying them of the detour path. Visitors will be directed to exit the greenway at 100th St. to access alternative paths and local streets. Cyclists may re-enter the greenway at West 153rd Street and Riverside Drive via the Herman “Denny” Farrell Pedestrian Bridge. Pedestrians may re-enter via steps at Tiemann Place that connect Riverside Drive to St. Clair Place.

The Cherry Walk is slated for necessary safety and infrastructure work as part of a $1.5 million FEMA-funded reconstruction to address damage caused by Superstorm Sandy in Riverside and Fort Washington parks. The project will restore the vulnerable shoreline and repave the path, providing a safer and smoother biking experience.

The Cherry Walk will be temporarily closed until further notice.

Related Parks

Was this information helpful?