The Recreation Center is currently closed for reconstruction. This project will install a new HVAC system and a roof and drainage system. In addition, the granite stone facade will be fully rehabilitated and all the existing windows will be replaced with replica ones. The restroom facilities on the first floor will be completely upgraded so that patrons will have exterior access from the field level of the structure. The main entrance steps at field level will be modified to include a new ramp structure for ADA accessibility. Please pardon our appearance.
Anticipated Completion: Fall 2012