PARK FACT:
Do you know an interesting tidbit about J. Hood Wright Park that you’d like to share? Please send it to us!
J. Hood Wright Park
W. 173 St. Bet. Haven Ave. And Ft. Washington Ave.
Manhattan
Directions: Google Maps | MTA Trip Planner
Acres: 6.70
Dog Runs
You and your dog are welcome in New York City parks, and there are numerous opportunities to enjoy the outdoors together. For the safety of both humans and canines, please review our Dog Rules and Regulations before entering the park.
Please Note: There are four designations for areas within parkland.
No Dogs Allowed: Dogs are not permitted in these areas at any time. These areas include playgrounds, zoos, swimming pools/facilities, bathing areas/beaches*, fountains, ballfields, or on basketball/handball/tennis courts.
Dogs Must Be Leashed at All Times: Dogs must be kept on a leash at all times when in these areas.
Dog Runs: Dog runs are large, fenced-in areas for dogs to exercise unleashed. Created with the expertise of a Parks Department landscape architect and volunteers, the runs encourage play while supplying good drainage, safe lighting, and healthy plantings.
Designated Off-Leash Areas: Certain park areas allow dogs to be off-leash from the time the park opens until 9 a.m. AND from 9 p.m. until the park closes. Dog owners/attendants with dogs off-leash in these designated areas must obey all general rules, including having their dog under control at all times, licensing the dog, and carrying proof of the dog's rabies vaccination.
| Name | Address | Type | Accessible | Notes |
|---|---|---|---|---|
| J. Hood Wright | Fort Washington & Haven avenues, West 173rd Street | Run |
Directions to J. Hood Wright Park

Know Before You Go
This project includes a number of improvements throughout the park with an aim to provide an overall sense of restoration. The work includes the reconstruction of the central lawn panel, dog run, entrance ramp from Pinehurst Street, new asphalt pathways and safety surfacing for the playground. Improvements to the dog run include water access, concrete curbs, fencing, surface material and benches. Additional drainage infrastructure will be added in both the playground and central lawn panel to help improve the longevity and usability of the improvements in these areas.
Thank you for your patience as we improve your park.
Anticipated Completion: Spring 2012














